My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
13889
>
3500 - Local Oversight Program
>
PR0545719
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:47:36 PM
Creation date
6/3/2020 11:22:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545719
PE
3528
FACILITY_ID
FA0005335
FACILITY_NAME
CHARLES JACOBS
STREET_NUMBER
13889
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
13889 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page I of 2 <br /> Mike Infurna [EH] <br /> From: Mike Infurna [EH] Qq <br /> D� <br /> Sent: Thursday, February 26, 2009 9:03 AM <br /> To: 'Tim Cuellar' <br /> Subject: RE: Terminous Market ( r <br /> official reply: <br /> 1-Quartery "Reporting" is still required and to be uploaded to GT. See the EHD <br /> referrences to CCR 2652d in the letter dated Feb 23, 2009. <br /> 2-Ground water sampling, gauging and depth to water measurements and <br /> geological (professional interpretations) in report format to Geotracker is hereby <br /> modified for MW-1, MW-2, MW-4 and MW-6 to annually, during Third Quarter, <br /> starting 3rd-2009 if the site has not received NFA yet. <br /> 3- MW-3 and MW-5 may have sampling and laboratory analyses reduced to semi- <br /> annual (first and third quarters) and are to be sampled for: MW-1 , TPHg and <br /> BTEX. MW-3, TPHg BTEX, Tame, 1 ,2-DCA. Reporting is still required during <br /> second and fourth quarter as per referrences in my Feb 23, 2009 letter. <br /> 4-In consideration of a NFAR that is required very very soon, ALL MWs are to be <br /> sampled for ALL analytes (TPHg, BTEX, oxys, lead scavengers) for the quarter the <br /> NFAR is submitted to Geotracker. If, like I strongly recommend, you plan/get me <br /> the NFAR during the 1st -2009, then this event is to be ALL wells/ALL analytes and <br /> paragraphs #2 and #3 are superceded. but if you delay and don't get me the NFAR <br /> until 2nd-2009, then it shall include all wells/all analytes and the first qrt -2009 follow <br /> paragraph #2 and #3 above. <br /> questions? <br /> From: Tim Cuellar [mailto:tcuellar@advgeoenv.com] <br /> Sent: Wednesday, February 25, 2009 3:23 PM <br /> To: Mike Infurna [EH] <br /> Subject: Terminous Market <br /> Mike, <br /> Now before you say 'NO.....here me out @. I have reviewed your recent denial letter for <br /> Terminous Market (see attached) to suspend ground water monitoring activities. In your letter, <br /> you direct that a NFAR be prepared, and that the 1st quarter 2009 ground water monitoring data <br /> be included in the report. Sounds pretty reasonable to me. AGE will start working on the NFAR <br /> immediately. <br /> The ground water monitoring program currently consists of monitoring wells MW-1 through MW-6 <br /> for TPH-g, TPH-d, BTEX, 5 oxys, 12-DCA & EDB (see attached table). Because wells MW-1, <br /> 5/28/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.