Laserfiche WebLink
N. DBC-% 1+I ATION PLAN <br /> 1. Personnel Decontamination <br /> Section III C. lists the tasks and specific levels of protection required for each. <br /> Consistent with the levels of protection required, step by step procedures for <br /> personnel decontamination for each Level of Protection are attached. <br /> 2. Levels of Protection Required for Decontam.irnation Personnel <br /> The levels of protection required for personnel assisting with decontamination will <br /> be [ Level B, Level C, -�/ Level D] . <br /> ( CHBCK) Modifications include: �oM a res /o 0 <br /> 4. Equipment Decontamination <br /> A procedure for decontamination steps requ for ren-sampling. equipment and heavy <br /> machiLnery fol 1lows: /',, <br /> o ti rroi P w� rht+� <br /> gOfhP 11 9C n <br /> 5. sampling Equipment Decontamination <br /> Sampling equipment will be decontaminated in accordance with the following procedure: <br /> A17 ��A OV) f" <br /> 3. Disposition of Decontamination Wastes <br /> (Provide a description of waste disposition including identification of storage area, <br /> hauler, and final disposal site if applicable.) <br />