Laserfiche WebLink
ge 1 of 2 ENCROACHMENT PERMIT PERMIT NO, P1_-Ir <br /> F TRACY DATE OF ISSUANCE <br /> PERMIT VALID IIP TO a -2\ <br /> O! s No - PROJECT COST_==== (V m <br /> P004r fax Now 7671 <br /> Rom INSPECTION DEPOSIT_ i 2 0•b' y a . <br /> PERMIT FEB $ <br /> GuA'R. <br /> OD ENGINEERING FEES <br /> Avex$ ZS TESTING PEES <br /> p1p»f <br /> F=6 PERFORMANCE BOND "Z•n oo e.+ N <br /> Fat 3 <br /> is -__. .., m.JWACH ON Tn P o1;L W SIDE OF 7-F13T4f %'T(ZFJ.I" FRON [Lin ,.. <br /> �� m <br /> 3T W L%-C OF STREET FOR THE PURPOSE OF Mtwa CLc&tr rQ W&I_L 1.NRTALLAitOrl m <br /> w <br /> ' N <br /> IE OF APPLICANTW V ADDRESS 42ttk DQ. 1 S.A.*6' PRONE_: C4ftI 3-C3 7S% <br /> ?ROVED BY FIELD SUPERINTENDENT. _Zt6w Afim� <br /> CONTACT PHONE NUMBER. <br /> 4DITIONS OF PERMI0T. <br /> The Permittee shall notify the Public Rorke Department - Inspection Division (831-4420) forty-eight (48) hours <br /> prior to start of work pertaining hereto. , <br /> The Permittee agrees to perform work under this permit in accordance with the prevailing City Standards, <br /> Specifications and shall comply with all existing codes and policies. s <br /> Permittee shall notify Police 6 Fire Departments before starting construction of any work. <br /> Tentative starting date `1-23"97 _ <br /> Tentative completion date WI-21-107 CITY INSPECTOR'S_COMPLETION REPORT <br /> If construction is not started within 90 days from m <br /> the issue date, this permit will be void unless DATE OF COMPLETION <br /> otherwise stated in the special conditions. CONCRETE o <br /> Contractors must display name and phone number at work ASPHALT m <br /> site - preferably on barricades. SIDENALK Z <br /> The coat of emergency work required to restored BACKFILL D <br /> .unsatisfactory construction that becomes a hazard will PAVING <br /> be charged to the Permittee. - SIZE OF CUT <br /> Replace full concrete sidewalk squares, ae required, SQ. FT. INCHES <br /> by sawcutting along score marks. PAVED BY: <br /> compaction teats shall be required on backfilled trenches <br /> at the expense of the Permittee (contact City Engineering COMMENTS: <br /> Department) . <br /> Traffic control shall be in accordance with the City D <br /> TrOffic-Manu 41. <br /> M <br /> Trenching and resurfacing is to comply with Standard <br /> Plan No. 501 and 501A. CITY INSPECTOR m <br />