Laserfiche WebLink
WELL MONITORING DATA SHEET <br /> Project # p� Client <br /> ampler Start Date if�zo.o g) <br /> Well I D MW .L Well Diameter 3 4 6 8 <br /> Total Well Depth 1 z Depth to Water <br /> Before After Before AfteT <br /> 5 <br /> Depth to Fiee Product Thickness of Fiee Product (feet) <br /> Refe>!enced to PVC) Grade D O Meter (if req'd) Ys1 HACH <br /> Ptitge Method Sampling Method Ballet <br /> Batter W aterra tsposable Baffle <br /> tsposable Basle Pet istaltic x action Port <br /> Middleburg Extraction Putnp Dedicated Tabora <br /> Elects is Submersible Other Other ` <br /> Well Diameter Multi leer Weil Diameter Multiplier <br /> 1 004 4' 06a <br /> l . (Gals )X 3 — ?j. ! Gals 2" 0 t6 6 1 47 <br /> 1 Case Volume Specified Volumes Calculated Volume 3 037 Other radnis,"0 163 <br /> Time Temp (°F) PH Cond Turbidity Gals Removed Obseivaiioris <br /> yL�� �. Z (�3� E. z <br /> '�zs � 6� • 3 • � � �61 7zv 3 <br /> IZfo 6 •� . f � �63, } y <br /> Did well dewater? Yes 10 Gallons actually evacuated y <br /> Sampling Time Z,��" Sampling Date <br /> zo•e�0 <br /> Sample I D MW _ Z Laboiatoiy G Je� <br /> Analyzed for P G B E. TB TPH-D Other T�5 <br /> Equipment Blank I D {� T„�,� Duplicate I D <br /> Analyzed fol TPH-G BTEX MTBE TPH-D Other <br /> r nib mo <br /> O (�f <br /> req'd) Pie-purge �t Post-purge <br /> ORP (if req'd) Die-purge mV Post-pulge MV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CQ 95112 (408) 573-0555 <br />