Laserfiche WebLink
GROUNDWATER CONTOUR MAP AND GRADIENT <br /> A groundwater contour map was prepared for December 26, 1995 from the data listed in Table <br /> 1 (see Figure 1) Groundwater elevation contours were plotted from the measurements and <br /> plotted to a known datum The groundwater flow was in a northerly direction under a calculated <br /> gradient of 0 0046 <br /> DISCUSSION <br /> Concentrations of TPHG were observed in well MW-1 BTEX components were also observed in <br /> well MW-1. <br /> MONITORING SCHEDULE <br /> The continuation of the quarterly groundwater monitoring program is recommended for this site <br /> and is scheduled for March, 1996 <br /> STATUS <br /> At the time of this report, Wright is in the process of securing all the necessary permits from <br /> the PHS-EHD and the City of Tracy to further define the lateral and vertical extent of <br /> groundwater contamination Further work is anticipated to be completed by the end of <br /> February, 1996 <br /> LIMITATIONS <br /> This quarterly sampling and report was performed using recommended current guidance <br /> documents of the state of California Regional Water Quality Control Board The statements, <br /> conclusions, and recommendations are based on present site conditions Conditional changes may <br /> occur through time by natural or manmade processes on this or adjacent properties Future <br /> review and interpretations should consider regulatory changes that any have been enacted <br /> subsequent to preparation of this report Wright Environmental Services, Inc. is not <br /> responsible for laboratory errors, and no warranty or guarantee is implied therein <br /> If you have any questions concerning this report, please call our Tracy office at (209) 833- <br /> 0758 <br /> S,��RE <br /> Sincerely, ��1ER if <br /> V7 <br /> Environmental Services, Inc 0 <br /> x{01262 <br /> V V `�� f�L � CERTIFIED <br /> ENGINEERING <br /> Lester Messina Christopher M. Palmer GEOLOGIST <br /> Project Manager C. E G. 1262 �Q- <br /> aF CAufC3 <br /> Attachments: Figure 1 Site Map,Groundwater Elevation, Contour Map <br /> . Appendix A Groundwater Sampling Information Sheets <br /> Appendix B Chemical Analytical Date and Chain-of-Custody Forms <br />