Laserfiche WebLink
ro <br /> F �T P E C I A L P R O V I S I O N S <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility, company (permittee) shall furnish <br /> full-time supervision oft all -work to insure full compliance <br /> with the permit provisions. <br /> 2. START OF WORK: No work within the County right of way shall <br /> Be started until the utility company representative has made <br /> an evaluation of weatherlconditions and has determined the <br /> work can be accomplishedilunder the „provisions of the permit: <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the <br /> pavement outside the area of work, and if inadvertently track- <br /> ed onto the road travelway shall be removed immediately. <br /> 4. DAILY RESTORATION: Private driveways and road intersections <br /> 19hall be restore2r daily.q <br /> 5. WEATHER-TIGHT CONDITION:ij All trenches shall be filled and <br /> compacted, itches an other drainage facilities regraded <br /> and opened, and the entire work area restored to weather- <br /> tight condition prior to !any rain. <br /> a� <br /> a <br /> .i <br /> i� <br /> 3 <br /> i� <br /> ii <br /> Engineering Form 115 <br /> 5/79 <br />