Laserfiche WebLink
TABLE OF CONTENTS <br /> PAGE <br /> 1. INTRODUCTION 1 <br /> 2. SCOPE OF WORK 1 <br /> 2.1 TASK 1 - PREFIELD ACTIVITIES 2 <br /> 2.2 TASK 2 - INSTALL THREE VAPOR EXTRACTION WELLS 2 <br /> 2.3 TASK 3 - DESIGN OF THE VES <br /> 3 <br /> 2.4 TASK 4 - PERMITTING OF THE VES <br /> 3 <br /> 2.5 TASK 5 - INSTALLATION OF THE VES <br /> • 3 <br /> 2.6 TASK 6 - INITIAL STARTUP OF VES <br /> 4 <br /> 2.7 TASK 7 - MONITORING, MAINTENANCE, AND OPERATION OF VES 4 <br /> 2.8 TASK 8 - MANAGEMENT <br /> 5 <br /> 2.9 TASK 9 - REPORTING <br /> 5 <br /> 3. SCHEDULE <br /> 6 <br /> f <br /> I <br /> F <br /> 4 <br /> VAPOR EXTRACTION TECHNOLOGY <br />