Laserfiche WebLink
Reliable At a service . <br /> station on the ii <br /> -ORS Environmental Equipment west Coast, <br /> has been designing; manufactur- __Electric the ORS <br /> 9 9% Supply . Catalytic <br /> ing and installing innovative sys- Scavenger` 0 <br /> toms for site remediation and con- Contaminated I <br /> Vapor Influent + Temperature system was used for on site <br /> taminant recovery since 1975. 1I Sensor destruction of <br /> * <br /> ORS systems have been field contaminatedvapors emitted <br /> proven on thousands of projects s from a Soilwe <br /> //�� <br /> worldwide. From the innovative -` fp s, Vent System. Q <br /> F.,. -, The unit <br /> Filter Scavenger®oil/waterachieved a <br /> separator, to our ambient monitor- 99%destruc- <br /> ing units, to our full-scale remedia tion rate for <br /> benzene, <br /> tion systems, ORS equipment has A which met <br /> operated reliably on virtually ri. California Air <br /> Vapor,ever kind of remediation ro ect. pot Pollution Con- <br /> y <br /> � � � <br /> y IClean X` trot District <br /> Effluent `.3�1ti1 <br /> This experience is built into every Waste Heat requirements. <br /> Catalytic Scavenger system and is Discharge operating <br /> costs were less <br /> part of what you can depend on than$300 per N <br /> with every ORS product. i month. <br /> Above- <br /> Benefits Process flow <br /> diagram show- The Catalytic <br /> * On-site contaminant destruction Ing path of gas Scavenger'from remedia- system was <br /> tion system to used on site to <br /> ■ No off-site hauling or disposal discharge. destroy the <br /> Contaminated vapors from an <br /> ■ No long-term liability vapors aro underground <br /> preheated in fuel spill in <br /> ■ Flexible design accommodates the heat Maryland.The <br /> multiple applications - exchanger by unit was <br /> hot exhaust installed to <br /> ■ Low operating costs released from replace a car- <br /> the catalyst. bon tank which <br /> When environmental regula- Gas passes cost the client <br /> tions require clean emissions, through the $15,000 in lust <br /> put the Catalytic Scavenger heater to the three days.In <br /> catalyst where five months, <br /> system to work for you, combustion the Catalytic <br /> takes place. Scavenger <br /> The clean destroyed <br /> vapor effluent approximately <br /> is discharged 6000 lbs.of <br /> after being vapor phase <br /> cooied in contaminants, <br /> the heat and saved the <br /> Engineer tak- exchanger. client hundreds <br /> Ing digital of thousands <br /> readout of. of dollars in <br /> influent air operating <br /> temperature costs. <br /> at the catalyst <br /> through glass <br /> viewing port. <br />