My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_CASE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2900 - Site Mitigation Program
>
PR0505512
>
FIELD DOCUMENTS_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2020 11:21:06 AM
Creation date
6/4/2020 11:16:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
CASE 2
RECORD_ID
PR0505512
PE
2950
FACILITY_ID
FA0006827
FACILITY_NAME
BP/MOBIL SERVICE STATION
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
02
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This permit is issued pursuant to all provisions of City of Tracy Municipal Code. This permit is granted upon the <br /> express condition that the permittee shall be responsible for all claims and liabilities arising out of work <br /> performed under the permit or arising out of permittee's failure to perform the obligations with respect to street <br /> maintenance. The permittee shall,and by acceptance of the permit agrees to,defend,indemnify,save and hold <br /> harmless the city, its officers and employees,from and against any and all suits,claims or actions brought by any <br /> person for or on account of any bodily injuries,disease or illness or damage to persons and/or property <br /> sustained or arising in the construction of the work performed under the permit or in consequence or permittee's <br /> failure to perform the obligations with respect to street maintenance. <br /> P rmit e a as to abide t1rovisions of this permit. <br /> P RMITTEE'S SIGNATURE DATE <br /> Prior to excavation,Contractor must conta81:-t19e4ollewing to have below-gfeEE"''na feellitlesieeated(48 hours pri8 <br /> to work): <br /> UNDERGROUND SERVICE ALERT <br /> Toll Free: (800)227-2600 <br /> Boyd Service Center <br /> (209)831-4420 <br /> Note: You are notified that Section 6500 of the Labor Code requires the issuance of a permit by the Division of <br /> Industrial Safety of the State of California prior to the construction of any trench or excavation which is five feet or <br /> deeper and Into which a person is required to descent, Excavation In city street areas without an excavation <br /> permit may be punishable by a fine, <br /> Permittee agrees that they hereby accept complete responsibility for coordination with,reporting to,and <br /> complying with the direction of, any and all boards or districts,including but not limited to,San Joaquin County <br /> Local Health District and California Regional Water Quality Control Board,or any other regulatory agency having <br /> Jurisdiction or authority over soil or ground water contamination such as that currently found at the site of this <br /> work,Including the preservation of the health and safety of persons working near or in any trench or excavation <br /> or on the surface of the construction project,or any persons passing by or observing,or any persons living in the <br /> vicinity of the construction project,for any reason whatsoever that may adversely,or otherwise affect the health <br /> or safety,now and In the future,of these persons or group of persons. <br /> Furthermore, permittee hereby accepts complete responsibility for disposal of any petroleum affected soils,or <br /> ground water,including reporting to and complying with the requirements of any,or all,of the stated,or any <br /> other,regulatory agencies as discussed above. <br /> CITY INSPECTOR's COMPLETION REPORT NUMBER. L f <br /> Date of Completion: Concrete: <br /> Asphalt: Sidewalk: <br /> Backfill; Paving: <br /> Size of Cut <br /> sq.Ft. Inches Paved By: <br /> INSPECTOR SIGN OFF: <br /> Last updated 911712009 Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.