Laserfiche WebLink
1 <br /> Project Quarterly Update Report July 30, 1991 <br /> 9110 Thornton Road, Stockton, California Page m <br /> TABLE OF CONTENTS <br />' PAGE <br /> INTRODUCTION 1 <br />' SCOPE OF WORK 1 <br /> GROUNDWATER MONITORING 4 <br />' GROUNDWATER SAMPLING AND ANALYSES 11 <br /> REMEDIATION SYSTEMS 12 <br /> GROUNDWATER REMEDIATION SYSTEM 12 <br />' SUMMARY 14 <br /> CLOSURE 14 <br /> LIST OF FIGURES <br />' FIGURE 1 SITE LOCATION MAP 2 <br /> FIGURE 2 SITE PLAN 3 <br /> FIGURE 3 HYDROGRAPHS FOR MW-7, MW-8, MW-9 5 <br /> FIGURE 4 POTENTIOMETRIC SURFACE MAP (4/24/91) 8 <br /> FIGURE 5 POTENTIOMETRIC SURFACE MAP (5/27/91) 9 <br /> FIGURE 6 POTENTIOMETRIC SURFACE MAP (6/24/91) 10 <br /> FIGURE 7 DISSOLVED HYDROCARBON DISTRIBUTION (5/27/91) 13 <br /> LIST OF TABLES <br />' TABLE 1 WELL DATA AND STATUS 7 <br /> TABLE 2 DOMESTIC WELL OWNERS 11 <br /> APPENDICES <br /> APPENDIX A TABLE OF GROUNDWATER MONITORING DATA <br /> APPENDIX B STANDARD OPERATING PROCEDURES <br /> APPENDIX C TABLE OF MONITORING WELL GROUNDWATER AND DOMESTIC WELL WATER <br /> LABORATORY RESULTS <br /> APPENDIX D GROUNDWATER LABORATORY REPORTS <br /> APPENDIX E LABORATORY RESULTS (MONITORING AND PUMPING WELLS) <br /> APPENDIX F DOMESTIC WELL HISTORICAL LABORATORY DATA <br /> -IJON GROUNDWATER <br /> u 1 tE I TECHNOLOGY,INC <br />