Laserfiche WebLink
1 <br /> 4 <br /> COLLECT ON SITE <br /> SOIL SAMPLES <br /> SOURCE <br /> AREA SOILS NO EVALUATE ADDITIONAL SOIL <br /> MEET CLEAN—UP REMEDIATION vs. CONTINUED <br />' OBJECTIVE? GROUNDWATER MONITORING OPTIONS <br />' YES <br /> ABANDON CONTINUE GROUNDWATER SUBMIT REQUEST CONTINUE DOMESTIC <br /> DRY WELLS MONITORING/SAMPLING FOR SITE CLOSURE WELL SAMPLING <br />' AT REDUCED FRE0UENCY PROGRAM <br /> GROUNDWATER 4057 PORT CHICAGO NWY PROJECT APPROACH <br /> ❑ TECHNOLOGY CONCORD. CALIFORNIA FLOW CHART <br />' {spa) s»—saa� <br /> CLIENT: LOCATION: R[Y. NOa DAM <br /> THE SOUTHLAND 9110 THORNTON ROAD 0 4/23/92 <br /> CORPORATION STOCKTON. CALIFORNIA <br /> PM PE RG DESIGNED DETAILED uAD ntz, PROJECT NO: FIGURE: <br /> GM CSY FC492 020301211 4 <br />