Laserfiche WebLink
� • i <br /> PROJECT OVERVIEW <br /> SOUTHLAND SITE NO. 20680 <br /> 9110 THORNTON ROAD <br /> STOCKTON, CALIFORNIA <br /> ■ Duration of Project: 9 years 1 month (April 1986 to present) <br /> ■ Expenditures to Date: $1,220,000 + <br /> Drilling/Soil Sampling: 34 boring locations <br /> (Assessment) 2120 feet of drilling, 33 soil samples <br /> Groundwater Monitoring: 155 gauging events <br /> (Southland Wells) 120 sampling events <br /> 958 groundwater samples <br /> GROUNDWATER <br /> TECHNOLOGY <br />