Laserfiche WebLink
U4/07/S4 09 51 I-AA 91b 371 6761 6ROOJA1AIER TECH -- Cli UUNCURD LILUUoi011 <br /> Recove Test Analysis Calculations <br /> RW.-1 Parameters <br /> From the graph (following) , the slope of the line over one log cycle <br /> (AS) = 6. 5 ft. <br /> Q = 5. 0 gpm <br /> Conversiong <br /> S = 6. 5 ft X 1M/3 . 28 ft = 1. 98M <br /> I <br /> Q = 5 gpm (1440 minjday) = 962 . 6 ft3/day (IM3/35. 29 ft3) <br /> = 27 . 28M3/day <br /> 7. 46 gal/ft3 <br /> i <br /> ISolving T = 2 . 30Q <br /> 4r ,6 s ' <br /> T = 2 . 30 (27. 28M3/day) <br /> = 2 . 52M2/day <br /> 4v (1.98M) <br /> T = 2 . 52M2/day [ 10. 7584 ft2/M2] =E22 ft2/day <br /> MW-4 D <br /> Parameters From the graph (following) , the slope of the line over one <br /> log cycle (QS) = 0. 172 ft <br />' Q = 5. 0 gpm <br /> Conversions <br />' S = 0. 172 ft (1M/3 . 28 ft) = 0. 052 M <br /> Q = 27 . 28 M3/day = 5 gpm <br /> Solving T = 2. 30 Q <br /> 41r a s ' <br /> T 2 . 30 (27. 28 M3/day) <br />' = 96. 23 M3/day <br /> 4v (0.052M) <br /> T = 96. 23M3/day (10 . 7584 ft3/M2) = 1035. 28 ft2/day <br /> 1 <br />