My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0000632
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
8253
>
2600 - Land Use Program
>
MS-96-09
>
SU0000632
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 10:00:23 AM
Creation date
6/4/2020 11:48:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0000632
PE
2622
FACILITY_NAME
MS-96-09
STREET_NUMBER
8253
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95376
ENTERED_DATE
9/24/2001 12:00:00 AM
SITE_LOCATION
8253 W LINNE RD
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2' '2 <br /> a: .a <br /> q�iFORea <br /> MINOR SUBDIVISION <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> 1810 EAST HAZELTON AVENUE, STOCKTON, CA 95205 <br /> TELEPHONE: (209) 468-3120 <br /> BUSINESS HOURS: 8:00 a.m.to 12:00 p.mJ2:00 p.m.to 5:00 p.m. <br /> (Monday throw h Friday) <br /> APPLICATION PROCESSING STEPS <br /> STEP 1 CHECK WITH STAFF - Development Services Staff will explain the requirements and procedures to you. <br /> STEP 2 SUBMIT YOUR APPLICATION-Applications are accepted by appointment only. call 4683120 for an appointment <br /> When you apply,file all of the following: <br /> • FEE The staff will let you know the current cost of filing an application. Make checks are payable to the San <br /> Joaquin County Treasurer. <br /> • FORM <br /> Seven(7)copies of the completed application information forms(attached)which all owners must sign. <br /> • TENTATIVE MAP Seven(7)copies of a folded tentative map(see attached)and two(2)copies of an 8-1/2" x 11"reduced <br /> copy of the map. <br /> • PARCEL MAP If you believe the proposed division qualifies for a parcel map waiver,include a waiver request with the <br /> WAIVER application. <br /> • DEED One copy of a preliminary title report or Deed of the property. <br /> • SERVICES If your project requires connection to public facilities,you must submit a"will-serve"letter from the <br /> appropriate water,sewer or drainage entities at the time of filing. This letter must include a statement <br /> from the agency that they will serve the proposed development,and have,or will have,the capacity to <br /> provide such service. <br /> • APPLICATION Staff will check your application. If anything is missing,you will be notified in writing.The applicant will <br /> COMPLETE be sent a postcard once the application has been determined complete. (Your application cannot be <br /> processed until it is complete.) <br /> STEP 3 APPLICATION PROCESSING <br /> • CECIA The County will decide if the proposal will have an adverse effect on the environment If there are no <br /> adverse effects,the application will be processed. If there are potential adverse effects,further <br /> environmental review will be required. This may extend the processing time. <br /> • REFERRALS AND Staff will refer the application to any County departments,other agencies and surrounding property <br /> ACTION owners affected by your proposal. At the end of a review and comment period(about 4 weeks)the staff <br /> will approve your application if they can make required findings. If the staff cannot make the required <br /> findings,the application will be denied. <br /> • FINAL ACTION The action of the staff can be appealed to the Planning Commission. The staffs action is final unless <br /> appealed. For further information on the length of the appeal period,contact the staff. <br /> STEP 4 CONDITIONS AND ADDITIONAL PERMITS <br /> • PARCEL MAP Unless waived,a parcel map must be approved by the County Surveyor within 36 months of approval of <br /> the tentative map. <br /> • CONDITIONS The staff will send you the final action and if it is approved it will list conditions,by department,that <br /> must be met before you can file a parcel map. <br /> • IMPROVEMENT As part of the Parcel Map,Improvement Plan are sometimes required. They are engineered plans <br /> PLANS showing sewer,water,drainage,grading,frontage improvements,roads,street lighting. Facilities and <br /> Landscaping. <br /> • ENCROACHMENT Encroachment Permits must be acquired from the Public Works Department for any work performed <br /> PERMITS within the road right of way. If the project fronts on a state highway these permits are obtained from <br /> Caltrans. <br /> • SANITATION& Projects that will utilize on-site sanitation disposal and/or on-site wells,must obtain permits from the <br /> WELL PERMITS Environmental Health Division. <br /> • BUSINESS If the project involves a business,a Business License must be approved prior to starting operation. <br /> LICENSES Business License applications can be processed concurrently with the Minor Subdivision application. <br /> • BUILDING If the project involves construction,a Building Permit must be approved prior to commencement of <br /> PERMITS work. <br /> • SOIL SUITABILITY A Soil Suitability Study may be required to determine the suitability of the soil to support a septic <br /> STUDY system. <br /> • OTHER PERMITS Frequently other local,state and/or federal agencies will require permits for land use projects(e.g.Air <br /> Pollution Control District,Regional Water Quality Control Board or the Sheriffs Office). The Community <br /> Development Department will identify additional permits we are aware of that may be required for your <br /> project <br /> PA_MS.FRM Rev April 11,1996 <br /> -1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.