Laserfiche WebLink
1 <br /> D. SITE SAFETY WORKPLAN <br />' PERSONNEL <br /> Team Member Title Responsibility <br />' Paul Graff Senior Geologist Site Safety Coordinator <br /> Douglas I. Sheeks Senator Geologist Safety Officer <br /> Mark Hayes Staff Engineer Site Supervisor <br /> PERIMETER ESTABLISHED <br />' Map/Sketch Attached? Yes X No <br /> Site Secured? Yes X No <br /> Perimeter Identified' Yes X No <br />' Contamination zones identified? line defined? Yes No X <br /> Free Product? Yes No X <br /> Dissolved Product? Yes X No <br />' INVESTIGATION--DERIVED MATERIAL DISPOSAL: <br /> Soil generated from the excavation will be disposed at a proper <br /> off-site facility. <br /> I <br /> I <br /> 1 <br /> 92-074 H&S 4 <br />