Laserfiche WebLink
®®® V �! <br /> 26 April 2011 <br /> AGE-NC Project No. 03-1100 <br /> Page 6 of 6 <br /> 6.0. RECOMMENDATIONS <br /> Based on the conclusions presented in this report,AGE recommends continued installation <br /> and six-month operation of an'ozone injection remediation system as proposed in the <br /> AGE-prepared, Feasibility Study Report, dated 07 February 2008. AGE anticipates the <br /> ozone piping and ozone remediation system will be installed during the second quarter <br /> 2011. <br /> 7.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily <br /> exercised byenvironmental consultants practicing in this or similar localities. Findingswere <br /> based mainly upon analytical results provided by an independent laboratory. Evaluation <br /> of the geologic/hydrogeologic conditions atthe site forthe purpose of this investigation was <br /> made from a limited number of available data points (soil and ground water samples), and <br /> subsurface conditions may vary away from these data points. No other warranty, <br /> expressed or implied, is made as to the professional conclusions and recommendations <br /> contained in this report. <br /> Advanced GcoEnvironmental,Inc. <br /> f <br />