Laserfiche WebLink
i <br /> ' - I <br /> Cone Penetrometer Testing Report - March 2001 <br /> ' CURTISS PONTIAC-BUICK <br /> 2450 Toste Road, Tracy, California <br /> ■ 1.0. INTRODUCTION AND SCOPE OF WORK <br /> IAt the request of Mr Joe Toste, Jr of Tracy Marine Sales, Advanced GeoEnvironmental, Inc <br /> (AGE), has prepared the enclosed cone penetrometer testing (CPT) report for 2450 Toste Road, <br /> Tracy, California The report documents procedures and results for a subsurface investigation <br /> ' conducted at the site during March 2001 The site setting is Illustrated on Figure 1 Site structures, <br /> boring, monitoring well and CPT locations are depicted on Figure 2 <br /> ' The objective of the CPT investigation was to characterize and assess petroleum hydrocarbons in <br /> ground water and to characterize stratigraphy at the site This report is prepared in accordance with <br /> I guidelines established by the California Regional Water Quality Control Board - Central Valley <br /> Region (RWQCB) for investigation of underground storage tank (UST) sites A summary of <br /> previous investigations at the site and background information is included in the AGE-prepared <br /> ' Additional Site Assessment Work Plan, dated 30 October 2000 and Quarterly Report -December <br /> 1999, dated 14 February 2000 <br /> I• 2.0. PROCEDURES <br /> On 13 March 200I, two soil borings (CPT-1 and CPT-2) were advanced on-site utilizing CPT <br /> technology to model the geological and hydro-geological framework and to assess the vertical extent <br /> of dissolved petroleum-hydrocarbons beneath the site Lithologic data was collected from an initial <br /> ' CPT soil boring in each locality, a twin boring was then advanced to collect grab ground water <br /> samples from selected depths Boring logs are presented in Appendix A, a site plan depicting boring <br /> locations is presented In Figure 2 <br /> I <br /> 21 CPT LITHOLOGIC INVESTIGATION <br /> ISoil borings CPT-1 and CPT-2 were advanced vertically to a maximum depth of 70 feet below <br /> I surface grade(bsg),utilizing a 25-ton truck-mounted CPT drill ng equipped with 1 50-inch diameter <br /> hollow-stem rods A hydraulic ram was utilized for each CPT soil boring to advance a cone <br /> penetrometer tip to total depth of the soil boring Soil parameters such as cone penetrometer tip <br /> I resistance, sleeve friction, friction ratio (ratio between sleeve friction and tip resistance) and pore <br /> water pressure were continuously measured as the cone penetrometer was advanced to depth A <br /> continuous boring log was generated utilizing the Hogentogler Co CPT computer program The <br /> Hogentogler Co computer program utilized the CPT Soil Behavior Classification System <br /> (Robertson, P K,Campanella,R G,Gillespie,D and Greig,J, 1986)to generate a general hthology <br /> • type and display on a CPT boring log(See Appendix A) Rinseate generated during this investigation <br /> Advanced GcoEnvironmental,Inc <br />