My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GILMORE
>
411
>
2200 - Hazardous Waste Program
>
PR0544178
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2020 5:01:01 PM
Creation date
6/4/2020 4:51:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0544178
PE
2220
FACILITY_ID
FA0016204
FACILITY_NAME
ALAMILLO REBAR
STREET_NUMBER
411
STREET_NAME
GILMORE
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
411 GILMORE AVE 411
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Maintenance <br /> An employee from the Maintenance Department shall be on the Emergency Action Team <br /> to assist with preparing the building for an emergency, and handling building needs <br /> during a crisis. <br /> Done? Duty Notes <br /> Walk around the outside of the building <br /> with the Senior Person and ERT leader <br /> looking for signs of physical damage to <br /> the facility or the grounds. Be sure to <br /> scan the interior of the building as soon Consult with Senior Person and do not <br /> as you enter. enter building if severe damage is seen <br /> Before turning off the water supply to <br /> damaged and leaking pipes, assess the <br /> threat of fire by checking for signs of <br /> fire, electrical shorts, and potential gas <br /> leaks. Get input from other ERT <br /> personnel before making a decision to <br /> turn off leaking water lines. <br /> Inspect incoming power source(s). <br /> Inspect; above ground power lines <br /> coming into the building, transformers, <br /> electrical rooms were applicable, main <br /> power disconnects, sub panels, <br /> electrical supply lines to all machines. <br /> Test incoming power at a main <br /> disconnect to verify all 3 phases and <br /> ground continuity. In the case of a <br /> power outage, turn off all circuit Locate the origin of power to any shorted <br /> breakers in the main electrical room or circuits. Lock out power disconnect. <br /> at the main electrical panels. <br /> Inspect ceiling and ceiling lights for <br /> loose ceiling panels or light fixtures. <br /> Inspect crane runways for visible signs <br /> of damage. Visually inspect cranes. If <br /> the craneway and crane appear to be <br /> undamaged, carefully run the cranes <br /> from one end of the runway to the If craneway or crane is damaged, do not allow <br /> other to verify correct operation. access to the facility. <br /> Inspect all equipment. Lock out any <br /> equipment that may be dislodged from <br /> its original position. Equipment should <br /> remain locked out until it is repositioned <br /> and re-inspected. <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.