Laserfiche WebLink
x S X i <br /> 0 <br /> RETAINING WALL <br /> ARCO BUILDING <br /> 3425 TRACY BLVD: <br /> X <br /> EXCAVATION--\ <br /> STOCK PILE <br /> x 6.0' > <br /> EXCAVATION PIT m <br /> AT O d <br /> 1 ' <br /> 0 <br /> NOT TO SCALE PUMPS <br /> X <br /> `J 4 <br /> CLOVER RD_ t <br /> r <br /> u <br /> Approximate proposed groundwater monitoring <br /> well locations <br /> w Approximate January 21, 1987 Sampling Locations <br /> Figure 1. Sampling Locations and Proposed Groundwater <br /> Monitoring Well Locations at ARCO Service Station <br /> No. 2093, Tracy <br /> '3 I U <br />