Laserfiche WebLink
7 - <br /> :7 <br /> zl <br /> RETAINING WALL 1 <br /> A ARCO BUILDING <br /> 3425 ;TRACY BLVD.'. <br /> .E w. <br /> EXCAVATION <br /> STOCK PILE <br /> J'L [AT 6.0 > <br /> EXCAVATION PIT ,f m <br /> a <br /> �+ <br /> 71 a C <br /> NOT TO SCALE " PUMPS 3 <br /> CLOVER RD,; <br /> * Approximate proposed groundwater monitoring <br /> well locations <br /> Approximate January 21; 1987 Sampling Locations <br /> 3 T <br /> I <br /> Figure 1. Sampling Locations and Proposed Groundwater <br /> Monitoring Well Locations at ARCO Service Station <br /> No. 2093, Tracy <br /> f! '3 <br />