Laserfiche WebLink
ARCO Products CompaQ <br /> 2000 Alameda de las Pulaas A�k <br /> Mailing Address: Box 5811 >.::,,":,r;- i <br /> San Mateo, California 94402" <br /> Telephone 415 571 2400 <br /> -July 29, 1994 <br /> Ms. Donna Heran <br /> San Joaquin Co. Public Health Services <br /> Environmental Health Division <br /> P.O. Box 388 <br /> Stockton, CA 95201-0388 <br /> Re- ARCO meeting with PHSIEHD staff <br /> Dear Ms. Heran: <br /> ARCO will gladly meet with the PHSIEHD staff on August 9, 1994 at 10:00 AM . <br /> as requested in your July 14, 1994 letter. However, I was disturbed to read that <br /> the PHSIEHD staff believes that the commitments which ARCO made in March <br /> of 1993 have not been met and that ARCO has failed to comply with our mutual <br /> agreements. This is simply not the case and I believe that you have been <br /> misinformed by your staff. This letter reviews action items which were agreed <br /> upon at the March 1993 meeting and work which ARCO has performed to <br /> address the action items. <br /> Resna, on behalf of ARCO, mailed on April 22, 1993 a summary of the ARCO - <br /> PHSIEHD meeting to Ms. Laurie Cotuila of the PHSIEHD and Ms. Beth Thayer <br /> of the RWQCB. On April 29, 1993 the PHSIEHD responded with a letter to . <br /> ARCO which also summarized the meeting and presented action items which <br /> were to be performed. Site specific discussion of the action items follow. <br /> Fac. #2130, 7906 N. El Dorado St., Stockton <br /> PHSIEHD recommended that additional offsite wells be installed to the <br /> south and that the results of the air sparging tests be submitted'. <br /> In early November of 1993, after access permission had finally been <br /> granted by Cal Trans, ARCO was able to install,'2 wells south of the facility: <br /> Three sampling events have been performed on these wells since they were <br /> installed. ARCO has issued the.following reports on this site since the March '93 <br /> meeting: a) quarterly status reports dated 4114193, 613/93,10114193, & <br /> 2/16/94, <br /> b) Air Sparge Pilot Test report dated 6121193, <br /> c) Limited Subsurface Investigation report dated 6130193, <br /> d) Underground Storage Tank Removal report dated 2116/94 <br /> e) Problem Assessment report dated 616194 <br /> f) Final Remediation Plan for Soil & Groundwater dated 617/94. <br /> A! PPC1-7025-D <br /> ARCO Products Company m a oivisio-.c•=_..n:icRicnsielaCampany - 48-88! <br />