My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
3500 - Local Oversight Program
>
PR0545737
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2020 2:32:19 PM
Creation date
6/5/2020 2:23:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545737
PE
3528
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
02
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ARCO Meeting Minutes <br /> August 8, 1994 <br /> Page 5 <br /> ARCO stated that installation and operation of a vapor extraction system will begin once an <br /> abatement unit is available. ARCO said that they intend to utilize the next available unit for <br /> remediation of ARCO SS No. 760 which appears to have a higher degree of hydrocarbon impact. <br /> Mary disagreed and requested ARCO to evaluate he two sites by calculating a mass balance <br /> and make a determination based on the total amount of hydrocarbons in the soil. ARCO said <br /> they would provide this information of her in the near future. <br /> ARCO 2133,Stockton (Mary Meays) <br /> _ n <br /> Mary indicate that installation of the soil remediationong. s <br /> states that he extent of the groundwater and soil contamination o the soluth and westf the site <br /> +. <br /> has not been defined. She stated that her request for the remedial system was to be installed by <br /> July 20, 1994. Kyle explained that the owner of the site is a new franchisee and if ARCO <br /> environmental closed the station down for two weeks that would be required to install:the system, # <br /> then this new owner would loose a significant portion of his annual revenue because this is his $ <br /> peak season for sales. Therefore,he system construction will commence the week after Labor <br /> Day. The County agreed with this. Chuck explained that all permits are in place and the contract <br /> for building the system has been awarded. E <br /> ARCO would like to state that they have been very.diligent with design and implementation of the <br /> vapor and sparge remedial system. There are many elements to securing information that <br /> ultimately have major influence and factors for this kind of remedial approach. We would like to ` <br /> add that we are much further along then other responsible parties in the area. <br /> i. <br /> Mary says that ARCO has not been diligent as she would like in obtaining permission to drill in <br /> Cal-Trans right of way between the ARCO site and the 1-5 off ramp. Steve Misner explained that <br /> BC requested a letter of refusal on a number of times from Mr. Galliano of Cal-Trans but they <br /> have not submitted one. Mary says we should write at least one more letter to Cal-Trans <br /> requesting permission. Chuck says a letter will be prepared. Diane Hinson states that it may be <br /> possible to drill a couple of hydropunch samples in this area, so that we will be out in the right of <br /> way one time. Diane will give Steve Misner the name of the contact she has at Cal-trans. <br /> Group discussed problems obtaining off site access to the condominiums to the south of the site. <br /> Misner states that BC has tried to reach the owner of the parking area with no success. Kyle <br /> states that 8C will write a letter to this person by the end of August. # <br /> Mary says she is going to require samples from below the groundwater table during he next <br /> phase of drilling. She says the data can be used to calculate the mass balance of hydrocarbons x <br /> in the soil. There was discussion concerning the use of this data and whether or not this data <br /> would really be accurate or even be detected. ARCO will agree to collect a few selected samples <br /> to show a good faith effort to further analyze whether or not this additional expense is <br /> appropriate. <br /> r Mary stated that during the initial release at this site he hydrocarbon vapors blew the city street <br /> lights out. - <br /> ARCO 6080, Lathrop (Linda Turkatte) <br /> Annual sampling should be conducted at this site. The sampling has been scheduled in August. a <br /> Linda suggest that the County split a sample with GTI when they are out there sampling in <br /> August and ARCO agrees. <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.