My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
3500 - Local Oversight Program
>
PR0545737
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2020 2:32:19 PM
Creation date
6/5/2020 2:23:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545737
PE
3528
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
02
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v � f <br /> ARCO Meeting Minutes { <br /> August 8, 1994 <br /> Page 7 a <br /> 1 <br /> ARCO 6100,Tracy, (Margaret Lagorio) <br /> R <br /> Margaret asked ARCO what the status was on performing further off-site assessment to <br /> delineate gasoline hydrocarbons in soil. ARCO stated that they had submitted an access <br /> agreement to the owner of the property across Patterson Pass Road in June, 1993. The property <br /> owner requested that the agreement be revised to address property restoration following <br /> completion of the investigationtremediation. The agreement was revised and resubmitted in April <br /> 1994. ARCO or EMCON has not received any word from the owner. ARCO said that they would g <br /> have EMCON resubmit the agreement for a third time. Margaret told ARCO to continue to include <br /> the status of obtaining access in future quarterly status reports. <br /> The results of the depth to groundwater investigation conducted on the on-site production well <br /> was discussed. Margaret said she received a copy of the report presenting the findings of the <br /> investigation and is satisfied that groundwater beneath the site is under confined conditions and <br /> is at a depth (deeper than 150 feet and likely 200 to 300 feet)that hydrocarbons in the soil would <br /> not impact groundwater. <br /> . . f <br /> ARCO 434, Lodi(Margaret Lagorio) <br /> i <br /> BC sent a copy of the revised soil boring locations to Margaret. ARCO has received off site <br /> permission for the Church property to the north of the site and the proposed boring locations in <br /> the City of Lodi right of way. ARCO is pursuing but does not yet have permission for the borings <br /> on the south side of Kettleman Lane. Kyle says we should go ahead and schedule the drilling <br /> now and the County agreed. <br /> Margaret needs information conceming the Biofi[ter, specifically a description of the system and <br /> the results. BC will provide her with a copy of the papers that have been prepared for the } <br /> system. Margaret indicates that she needs to be informed when modification to the system are <br /> being proposed and ARCO has provided notification via quarterly monitoring reports. } <br /> Summary i <br /> Y <br /> F <br /> Should you have any questions or comments please contact me at (415) 571-2469 so that we <br /> can make adjustments. 1 <br /> Y <br /> Sincerely, <br /> j <br /> Chuck Carmel <br /> Environmental Engineer ,. <br /> cc: Chris Winsor, PAC-1291 <br /> Kyle Christie, San Mateo <br /> Elizabeth Thayer, CVRWQCB <br /> Jay Johnson, EMCON <br /> Jay Lucas, Brown and Caldwell <br /> t <br /> ' S <br /> 3 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.