Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Paye 6 of 6) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared: 5/22/2020 <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault;4)devices monitoring product piping;5)devices monitoring fill piping;6)devices monitoring vent piping;7)devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors;and 11) devices monitoring any other secondary containment areas. <br /> Moniitoring System Certification <br /> USTMonit,orin.g Srt@Plan <br /> SAa Address STOCKTON UNIFIED SCFIODL DIST. 1932,EL PINAL DRIVE STDCFCTON CA 9520 <br /> xPIPLN G IAF <br /> (_iMOWS) 3= r <tR Se on or <br /> Drawma-of F=FILLS <br /> p4:iug At of C=VAPOR . . . OFFICE <br /> -&mpandLTDC's. F=P.RME <br /> A;oumder¢ouad L=TurTo-me;leak Detector <br /> dran mg i=_ X=SM0 SF-INOR <br /> acmuate,Ive S=$rine Se[Mr <br /> caw�oL speculate g=Smart Sewer T511400 EFJ <br /> Hue pr=. C=FivaL&Chama <br /> plt�_ E=E Stgp <br /> r{v itom unci'are ound rhe:are-not xviNe-10 are n <br /> prgfassiohui aporiore vn:and arevoie[t for 1 Llarmcnor ul anyoss. Drairu�g <br /> 7DF i6 SCQiB <br /> OYs RUL. . . <br /> L <br /> .RUL. <br /> DIE=SEL. . . . . . . . . <br /> . . . . . . . . . . . . . . <br /> DSL. 1 r J <br /> L . . . . . . <br /> �{ <br /> HUS WASH <br /> Da[e+nam was drawn: 5+13,'1 B <br /> LEGEND <br />