My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007555
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
3500 - Local Oversight Program
>
PR0545737
>
ARCHIVED REPORTS_XR0007555
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 11:25:40 AM
Creation date
6/8/2020 9:50:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007555
RECORD_ID
PR0545737
PE
3528
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
02
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s a � <br /> BP GEM OIL COMPANY TYPE A BILL OF LADING <br /> SOURCE RECORD BILL OF LADING FOR NON- <br /> HAZARDOUS PURGEWATER RECOVERED FROM <br /> GROUNDWATER WELLS AT BP GEM OIL COMPANY <br /> FACILITIES IN THE STATE OF CALIFORNIA', -THE NON- Station# <br /> HAZARDOUS PURGE- WATER WHICH HAS BEEN <br /> RECOVERED .FROM GROUND- WATER WELLS IS 3 c/� ,�' 7-ra` g J, -rr-ac <br /> COLLECTED BY THE CONTRACTOR, MADE UP INTO Station Address <br /> LOADS OF APPROPRIATE SIZE AND HAULED BY <br /> DILLARD ENVIRONMENTAL TO THE ALTAMONT <br /> LANDFILL AND RESOURCE RECOVERY FACILITY IN Total Gallons Collected From Groundwater Monitoring Wells, <br /> LIVERMORE, CALIFORNIA, <br /> The contractor performing thus work is BLAINE TECH <br /> SERVICES, INC (BTS), 1680 Rogers Avenue, San Jose, CA / �'� <br /> 95112 (phone [408] 573-0555) Blaine Tech Services, Inc is added equip an other <br /> authorized by BP GEM OIL COMPANY to recover, collect, y <br /> rinse water 5�. � adjustments <br /> apportion into loads the Non-Hazardous Well Purgewater that is <br /> drawn from wells at the BP GEM Oil Company facility indicated TOTAL GALS. loaded onto <br /> below and deliver that purgewater to BTS Transport routing of RECOVERED rs y BTS vehicle # %4(1 <br /> the Nor'-Hazardous Well Purgewater may be direct from one BP <br /> GEM facility to the designated destination point, from one BP BTS event# time date <br /> GEM facility to the designated destination point via another BP <br /> GEM facility, from a BIS GEM facility to the designated qo-3r--;L-srt t3�s' 3 I z /-v— <br /> destination point via the contractor's facility, or any combmation <br /> thereof The Non-Hazardous Well Purgewater is and remains the signature t� . <br /> property of BP GEM Oil Company <br /> This Source Record BILL OF LADING was initiated to <br /> cover the recovery of Non-Hazardous Well Purgewater from wells <br /> at the BP GEM Oil Company facility described below- REC'D AT time date <br /> unloaded by <br />
The URL can be used to link to this page
Your browser does not support the video tag.