Laserfiche WebLink
ARCO I BP WELL MONITORING DATA SHEET <br /> • BTS #. Station" �V <br /> Sampler Date <br /> Well I D _ Well Diameter_ 2 3 6 8 <br /> Total Well Depth Wq qe, Depth to Water. <br /> Depth to Free Product Tluckness of Free Product (feet). <br /> Referenced to PVC Grade DO Meter (if req'd) Ysl xAcli <br /> !1 D,amcicr <br /> Multiplier well Mantel multijklic <br /> I" <br /> 004 4" 065 <br /> 2" <br /> 016 6" 147 <br /> 3' 037 Other rad,us'•0 163 <br /> Purge Method. Bailer Sampling Method Basler <br /> Disposable Bailer )(Disposable Bailer T <br /> Middleburg Extraction Port <br /> fElectric Submersible Other <br /> Extraction Pump <br /> Other <br /> Top of Screen If well is listed as a no-purge, confirm that water level is below the top <br /> • of screen otherwise,the well must be purged <br /> X 3 _ K<-Z/- -- - Gals <br /> I Case Volume(Gals) Specified Volumes Calculated Volume <br /> Conductivi <br /> Time Temp (°F) pH (ntS o S) Gals Removed Observations <br /> ! Z <br /> G ...`I •i <br /> 0 <br /> Did well dewater? Yes (9) Gallons actually evacuated: -3s <br /> Sampling Time d Sampling Date- <br /> Sample LD _ Laboratory Pace ruo a Other <br /> Analyzed forPH- BTEX MTBE TPl-1-D Other <br /> Mgl <br /> . D O (if req'd) Pre-purgs -s/L Post-purge .$ L <br /> ORP (]f recl'd} Pre-purge mV Post-purge mV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San .lose, BA 95112 (408) 573-0555 <br />