Laserfiche WebLink
ARCO / BP WELL MONITORING DATA SHEET <br /> S # _ F° Station # <br /> Sampler. .V�,r;l Date h <br /> Well I D _ f Well Diameter q) 3 4 6 g <br /> Total Well Depth Depth to Water 112 72 <br /> Depth to Free Product Thickness of Free Product (feet) <br /> Referenced toPVC,) Grade ID O Metez (if req'd) si 1 HAcx <br /> _Well prameter Multioller Well Diameter Multi to <br /> I" <br /> 004 4. 065 <br /> 2" 0 16 6" 1 47 <br /> 3" 0.37 Oliver radiu2*0 163 <br /> Purge Method Haller Sampling Method Bailer <br /> Disposable Bailer 4isposable Bailer <br /> "Itddleburg Extraction Port <br /> Electric Submersible Other <br /> Extraction Pump <br /> Other <br /> Tap of Screen If well is listed as a no-purge,confirm that water Ievel is below the top <br /> of screen Otherwise, the well must be purged <br /> L X = _ --7 Gals <br /> 1 Case Volume(Gals} Specified Volumes Calculated Volume <br /> Conductivity <br /> Time Ternp (°F) PIT (MS ort� Gals Removed Observations <br /> 7 <br /> -7 <br /> )td well dewater? Yes Gallons actually--evacuated <br /> arnpling Tlme r .� �S Sarnpling Date <br /> 3 ,fir <br /> ample I D �—�_ Laboratory Pace equoia , OtI7er <br /> yzed for �[-GETEN:/ NtTBL- TPH-D Other 4,s C ��ac• <br /> t O (if req'd)- Pre-purget Post-purge nig/t, <br /> R P (if req'd) Pre-purge 111V Post-purge 111V <br /> lame Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (4081 573-0555 <br />