Laserfiche WebLink
ARCO I BP WELL MONITORING DATA SHEET <br /> T5 #: � Z 1z rte- 5N-f Station# grco t�93 <br /> Sampler: 5eott Nc eer=w+tar, Date: I t r+T ?e+o7. <br /> Well I.D.: ATa- -�_ Well Diaineter: (Z 3 4 G S <br /> Total Well Depth: 2 q,o$ Depth to Water: /1, <br /> Depth to Free Product: Thickness of Free Product (feet): <br /> Referenced to: vc Grade D.O. Meter (if req'd): sl RACH <br /> Wcll Diamete Well Diametc M1116 Tier <br /> 1" 4.44 4" 4.65 <br /> Y 2" 0.16 w b" 1.47 <br /> 3" 0.37 Other MCHUS,*0.163 <br /> Purge M.etllod: Bailer Sampling Method: Bailer <br /> Disposable Bailer KDisposable Bailer <br /> ;&Middleburg Extraction Port <br /> 'Electric Submersible Other: <br /> Extraction Pump <br /> Other. <br /> Tap of Screen: 17u r i e Uwell is listed as a no-purge, confirm that water level is below the top <br /> of screen. Otherwise, the well must he purged. <br /> 2. `+ x 3 = S. L'a Gals. <br /> I Case Volume (Gals.) Specified Volumes Calculated Volume <br /> Conducdvity <br /> Time Temp (°F) pH (mS orQ Gals. Removed Observations <br /> (t <br /> (08'a '�: (S 'fs s. GICatreA <br /> (t '7a• ( ?. <br /> Did well,dewater7 Yes G) Gallons actually evacuated: <br /> Sampling Time: It Sa Sampling Date: m /,-j <br /> Sample 1.D.: A TR-- Laboratory: Pace Se uoia Other <br /> Analyzed for: MTBE TPx-D Other: O x y p eA a.t r s b y -8.%(a <br /> o <br /> D.O. (if req'd):- Pre-purge: '"8/L + Post-purge: , q mg/i_ <br /> Q.R.P. (if req'd): Pre-purge: 117V Post-purge: nN <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />