My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007570
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
3500 - Local Oversight Program
>
PR0545737
>
ARCHIVED REPORTS_XR0007570
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 11:37:08 AM
Creation date
6/8/2020 9:58:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007570
RECORD_ID
PR0545737
PE
3528
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
02
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O&M SITE VISIT PROCEDURES <br /> 1) Review request form at least 1 day before site visit so you can get clarification from the requestor A short <br /> prefjeld meeting with the requestor to review non-standard requests is mandatory <br /> 2) Be sure LI Mat all equ1'.menl neccssary to perform various tasks is loaded into the truck Test <br /> equipment for proper operation prior to leaving office equipment to complete the request <br /> 3) Inform the requestor in advance if you do not have all necessary parts and <br /> 4) If you are performing system monitoring be sure to complete the forms completely, do not <br /> leave blank spaces Indicate "NA" if data to be collected do not apply to the site If you <br /> are unable to collect specific data, call the requestor and get directions Never leave site <br /> without obtaining necessary data or calling the requestor for directions <br /> 5) When collecting data, indicate data prior to system adjustment and at final setting Unless - - - <br /> noteworthy or requested, do not write down intermediary data <br /> 6) Get to know systems you work on intimately Carefully review manuals and instructions Additionally, get <br /> to know what our remediation goals consist of so you can more effectively operate the system <br /> 7) You are our eyes and ears, therefore, please indicate ANY system shortcoming or <br /> modifications that you believe will make the system operate more efficiently <br /> 8) Develop a sense for data that you collect' If you are getting data which are unusually low or <br /> high check the gauge for accuracy and recollect the data CALL ENGINEER FROM FIELD <br /> TO DISCUSS ABNORMAL DATA BEFORE YOU LEAVE THE SITE <br /> 9) Avoid writing derogatory remarks on the field data sheets Our client expects us to correct <br /> most problems duriAg the site visit Develop a spare parts list for each site so we can take <br /> care-of-minor problems during the visit <br />— -- - <br /> 0)—If-the system is experiencing problems that-you cannot take care-of-as part of_our-regular-- <br /> O&M <br /> egular- -O&M visit, call the Engineer Do not spend too much time (more than 1/2 hour) before <br /> - --- calling the Engineer for consultation-Be prepared to give the Engineer-an estimate of time LL and material it would take to fix the problem <br /> 11) When calling office to discuss field activities, be sure to talk to an ARCO engineering staff in <br /> person Ask the operator to page the person you need to talk to, and call alternate <br /> Engineers on the team if necessary <br /> 12) Check the hours allowed to complete a task prior to the field day Resolve differences prior <br /> to field day. If additional time is needed to complete a task,call the requestor or a <br /> substitute from the field to get authorization Be prepared to give a realistic estimate of <br /> additional time needed to complete the task from the field <br /> 13) Please tum in all field data sheets and chain-of-custody forms to the sampling coordinator <br /> within 24 hours of the field visit Afield data sheet must be turned in for any field visit, even <br /> if you are driving by and stop to check the system without the request' <br /> 14) Have a camera handy so you can photograph system modifications or problems Turnin <br /> pictures to the Engineer as soon as they are ready <br />
The URL can be used to link to this page
Your browser does not support the video tag.