My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007572
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
3500 - Local Oversight Program
>
PR0545737
>
ARCHIVED REPORTS_XR0007572
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 11:43:57 AM
Creation date
6/8/2020 9:59:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007572
RECORD_ID
PR0545737
PE
3528
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
02
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br /> REMEDIAL SYSTEM PERFORMANCE EVALUATION <br /> Soil vapor extraction (SVE) and air sparging were initiated on January 4, 1996 and June 18, 1997,respectively <br /> A brief description and performance evaluation of the remedial system between March 15,2001 and June 25, <br /> 2001 are presented below Field data sheets, chain-of-custody documentation, and laboratory reports are <br /> included as Attachment A-A <br /> SVE System <br /> The SVE system is comprised of 11 SVE wells (VES-1 through VES-7, and ATR-3, ATR-4,ATR-5,and TEX- <br /> 1) and a King Buck Hasstech 100-cfm catalytic oxidizer The SVE system is permitted by the San Joaquin <br /> County Unified Air Pollution Control District (SJCUAPCD) Permit to Operate Number N-3413-1-0, for <br /> operation through January 1,2002 <br /> During the months of scheduled operation, the SVE system was 49% operational this quarter During this <br /> period, the SVE system removed approximately 2 4 pounds of TPHg Benzene concentrations were mostly <br /> nondetectable, therefore, the system removed an undetermined amount of benzene this quarter To date, the <br /> SVE system has removed approximately 3,616 6 pounds of TPI-Ig and 10 6 pounds of benzene from the soil and <br /> groundwater beneath the site Historical SVE system performance and analytical data are summarized in Tables <br /> A-1 through A-3 Graphical presentations of TPI-Ig mass removal and influent concentration data are shown on <br /> Figures A-1 and A-2 <br /> Air Sparging System <br /> The au sparging system is comprised of I1 air sparging wells (VES-1 through VES-7, S-1 through S-3, and <br /> SMW-1) and a Conde 7 5-hp sparge blower The air sparging system operated at an average injection pressure <br /> of 4 0 psi and an average flow rate of 6 3 cfm Air sparging system operational data, including well open/closed <br /> status, flow rate and applied pressure, are presented in Table A-4 Historical dissolved oxygen levels for site <br /> wells are presented in Table 1 of this report <br /> Conclusion <br /> Influent concentrations of TPHg and benzene continue to decline The remedial system will continue to be <br /> pulsed during the third quarter, and then evaluated to determine if it will remain operational <br /> Attachments Table A-I - Soil Vapor Extraction System Performance Data <br /> Table A-2 - Soil Vapor Extraction System Emission Data <br /> Table A-3 - Soil Vapor Extraction System Well Data <br /> Table A-4 - Air Sparging System Well Data <br />
The URL can be used to link to this page
Your browser does not support the video tag.