Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM(Page s of s) <br /> XII. LINE LEAK DETECTOR TESTING <br /> Check this box if line leak detectors(LLD)are NOT installed.(Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are Installed. <br /> Was a leak simulated to verify LLD performance? 0 ❑ ❑ <br /> (Check all that apply.) Simulated leak rate verified: 3 GPH ❑0.1 GPH ❑0.2 GPH <br /> Was the testing apparatus properly calibrated? z EE01 <br /> For emergency generator tank systems,does the LLD create an audible and visual alarm when a leak is detected? ❑For mechanical LLDs,does the LLD restrict the flow through the pipe when a leak is detected? ❑For electronic LLDs,does the turbine automatically shut off when a leak is detected? <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? m ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? m ❑ El <br /> For electronic LLDs,have all accessible wiring connections been visually Inspected for kinks and breaks? <br /> Li <br /> Were all Items on the equipment manufacturer's maintenance checklist completed? ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? <br /> Ej <br /> For any answer of"M'above,describe in Section X111 how and when these issues were or will be corrected. <br /> XIII. COMMENTS <br /> XIV. VACUUM I PRESSURE I HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type(Mark all that apply.) ❑Vacuum ❑Pressure ❑Hydrostatic <br /> Sensor Functionality interstitial Communication <br /> Sensor ID Component(S)Monitored By This Sensor Test Test <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> [:]'pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> How was interstitial communication verified? Simulated Leak at Far Ends of the Interstitial Space Visual Inspection <br /> ❑Other(Describe the method in section XV below. ❑Gau e <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? Yes E]No(Describe the mason in section XV below.) <br /> For any answer of"Fail'above,describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH=Gallons Per Hour,Y=Yes,N=No,NA=Not Applicable,VPH=V 'c,ID=Identification <br />