Laserfiche WebLink
ARCO PRODUCTS COMPANY VES OPERATING REPORT,FOURTH QUARTER, 1997,ARCO 2093 <br /> SUMMARY OF OPERATIONAL DATA <br /> Reporting period 9/30/97-12/31/97 <br /> Current well source VES-2, VES-3, VES-4,VES-7,ATR-3,TEX-1 <br /> Current source(prior to dilution,to ppmv) Influent summary(PID data) <br /> TPH cone this period 115 (11/17/97) <br /> TPH cone last period 1050(8/11/97) <br /> Initial TPH cone(8/17/95) 1200 <br /> Benzene cone this period -- <br /> Benzene cone last period -- <br /> Initial benzene cone(12115195) 57 <br /> Current process(after dilution,to ppmv) influent summary(PID data) <br /> TPH cone this period(PID) 115 ppmv(11/17/97) <br /> TPH cone last period(PID) 180 ppmv(9/10/97) <br /> Initial TPH cone (Lab, 12/15195) 1200 <br /> Effluent TPH cone end of this period(PID) 3 0 ppmv(11/17/97) <br /> Effluent TPH permit requirement VOC's not to exceed 2 0 lbs/day if under 95%DRE, <br /> 5 6 lbs/day VOC if above 95%DRE <br /> %TPH destruction 97% <br /> Effluent benzene permit requirement VOC's not to exceed 2 0 lbs/day if under 95%DRE, <br /> 5 6 lbs/day VOC if above 95%DRE <br /> %benzene destruction -- <br /> Average source tlow(SCFM) 62 <br /> Average process flow(SCFM) 62 <br /> Average source vacuum(m H_O) 33 <br /> Assumptions <br /> I The quantity of hydrocarbons removed was estimated using the influent TPH concentrations <br /> at the oxidizer inlet <br /> 2 Percent up time was calculated by dividing actual operating hours as determined from hour meter <br /> readings by the total hours of the reporting period <br /> 3 Source flow,process flow,and source vacuum are based on averages established during site visits <br /> -'=Not available or not applicable <br /> Example calculations <br /> * TPH recovered(in lbs/day)=C x Q x 0 00038 <br /> * HC removed=Q x C x 0 00038 x(#hours/24) <br /> * LB HC/Utility= LB HC/(therms x 60 cents/therm+ kwh x 12 cents/kwh) <br /> Where <br /> C=Average influent TPH concentration(ppmv) <br /> Q=Influent flow rate(SCFM) <br /> 0 00038 is a constant and is derived as follows 10E-06ppmv x 60min/hr x 24 hr/day x 1 lb-mol/380 cu-ft x I00 lbs/lb- <br />• <br />