Laserfiche WebLink
SOIL VAPOR EXTRACTION SYSTEM <br /> FIELD MONITORING DATA SHEETS <br /> Date } - Time of Arrival <br /> Technician x SGr Time of Departure t 1 ) <br /> Site Engineer Rusty E.Benkosky _ Was Site Engineer or substitute contacted from field? <br /> Yes No <br /> PART A GENERAL INFORMATION <br /> Site Location 3425 Tracy Blvd. Tracy.CA Station No- ARCO 112093 Project No 7G600-026-01 Task 109 <br /> Abatement Equip M - Serial No <br /> SVE Blower - �_� oh�a�� Max AMP Rating 1 <br /> SPG Blower Cil 2-\(�� v+�L_ MAX AMP Rating %.4- <br /> Telemetry- J �1 <br /> l�3 Elect Meter Reading 7 C-3 <br /> Electrical Power 1 <br /> Supplemental Fuel-e— Supp Fuel Meter Reading <br /> No of KIO barrels at site Full , Empty <br /> PART B. SVE SYSTEM DATA <br /> System up or down upon arrival (If down please complete PART E) <br /> `' 4 ,yy <br /> Hourmeter Reading __ 146 G � C At time U <br /> i� <br /> Flow Data Before <br /> f Adjustment Final Ideal Range <br /> %Qllutlon air valve o n ! O S t7 C. <br /> % Recirculation valve open �% Z <br /> 1V0 Content(gal) Pr tis <br /> Vacuum @ blower(In H2O) �j G L <br /> Ga --a Range f c� <br /> AMPS drawn by blower motor AMPS <br /> Total System Flow(A P.in H.0) <br /> Pipe Size Z'-- /yl/F ✓ S-0 <br /> Well Field Air Flow(A P,in H2O) <br /> Pipe Size# 4' <br /> Ddution Air Flow(A P,'H2O) <br /> Pipe Size <br /> FI) <br /> FID Data OC/DF WC O DF Ideal Range <br /> System Influent my before dilution / d O O <br /> S tem Influent my after dilution - / [j <br /> System Effluent my Sr <br /> Field Instrument Used Last Calibrated <br />