Laserfiche WebLink
Case Closure Summary Page 2 <br /> Leaking Underground Fuel Storage Tank Program <br /> III Release and Site Characterization Information (continued) <br /> Maximum Documented Contaminant Concentrations -- Before and After Cleanup <br /> Contaminant Soil (ppm) Water (ppm) Contaminant Soil (ppm) Water (ppm) <br /> Before After Before After Before After Before After <br /> TPH (Gas) 830 830 114 <.05 Xylene 3.90 3.90 17.50 <0.0005 <br /> TPH (Diesel) <1.0 NA 160 1.070 Ethylbenzene 3.80 3.80 2.92 <0.0005 <br /> Benzene <0.5 <0.5 0.735 <0.0005 Oil &Grease NA NA NA NA <br /> Toluene <0.5 <0.5 15.50 <0.0005 Heavy Metals 7.70 Pb 7.70 Pb 0.048 Pb NA <br /> MTBE Unk Unk 15.10 0.0006 <br /> Comments: The soil before and the soil after concentrations are from sample TB-2 (the source area)taken at 12.5 feet bgs <br /> at the time of UST removals. The ground water before and the ground water after concentrations are from MW4 located <br /> within 10 feet of the tank pit and TB-2 (the source area). <br /> IV. Closure <br /> Does completed corrective action protect existing beneficial uses per the Regional Board Basin Plan?Yes <br /> Does completed corrective action protect potential beneficial uses per the Regional Board Basin Plan?Yes <br /> Does corrective action protect public health for current land use?Yes <br /> Site management requirements: NIA <br /> Should corrective action be reviewed if land use changes?Yes <br /> MonitoringlVapor wells decommissioned: No Number Decommissioned: 0 Number retained: 4 <br /> List enforcement actions taken: Level One, NOR sent to the RP <br /> List enforcement actions rescinded: None <br /> V. Local Agency Re resentative Data <br /> Name: Adrienne Ellsaesser Title: : Acting Program Coordinator <br /> Signature: Date: !� <br /> VI. Cen ral Valley Regional Water Quality Control Board RB Notification <br /> Date Submitted to RB: Response Date: <br /> RB Staff: J. Barton Response. <br /> Title: Eng. Geologist <br /> VII. Additional Comments, Data, etc. <br /> IF- <br /> This document and the related CASE CLOSURE LETTER, Shall be retained by the lead agency as part of the official <br /> site file. <br />