receipt of the permits, contractor schedula permitting. <br /> A comprehensive report of activities will be submitted 45 days <br /> after completion of field activities . A milestone schedule is <br /> included as Figure 3 . <br /> 4 .0 PROPOSED VERIFICATION MONITORING SCHEDULE <br /> i'oL3r monitoring wells w l! he installejc..?s the result of this work <br /> plan. Water sampler will be collected +rpm th(-sa wells af-rer <br /> davvlopment. A quarterly Groundwater monitoring prograr will be <br /> established at the completion of _ie2d activities. Mater_ samples <br /> will ,e routinely analyzed for TP -�gasrli.ne and 'BTEX, unless <br /> initial sampling results injicate the presence of TPH-diesel , or <br /> other constituents based on field location ( i. e. near the used oil <br /> tank) , are necessary. Water level and gradient will be reported <br /> in quarterly monitoring reports along with analytical data. <br /> 6 <br />