Laserfiche WebLink
,Raw TIP, <br /> ----- ---------- - - ------ - ---- - ---- - --------------, EXPLANATION <br /> •T-1 Soil sample location and ID <br /> Fi V Groundwater sample location <br /> UOExcavation limits <br /> SumpHT <br /> Station <br /> Budding <br /> i <br /> i <br /> I <br /> ' <br /> E I <br /> N <br /> , <br /> i <br /> IP-2 P-1 V <br /> i <br /> T-2 T-1 IP-3 o. <br /> i � - i P-4 <br /> T-3 TB-2 -8 <br /> T-4 <br /> TB-1 - ---- -- ----*P� <br /> -6 <br /> T-7 *P <br /> I <br /> TS T-6 P-7 P$ <br /> P-9 'k <br /> j TH2O <br /> I ' <br /> i planter Z <br /> - ----------- ------- ----.... ..- -----...------ . ....---------- <br /> 0 20 40 <br /> TRACY BOULEVARD <br /> approximate <br /> scale In feet <br /> UST, HOIST, SUMP, USED-OIL TANK AND <br /> FIGURE <br /> r <br /> Mill PRODUCT LINE SAMPLING MAP <br /> m lbuchstone <br /> M MDevelo ments Chevron Service Station No 9-8264 <br /> P 3775 Tracy Boulevard 2 <br /> 01-M Environmental Management Tracy, California <br /> PROJECT NO DATE DRAWN BY BASE MAP <br /> 9-8264 2796 WTJ FAX COPY OF CHEVRON SrrE PLAN 1994 <br />