Laserfiche WebLink
.l <br /> Ground Zero Analysis, Inc.. r <br /> SITE SAFETY PLAN <br /> {s1 Hazard :<.: Mitigat�ar Measure <br /> 1,2 Heavy Equipment (Noise &Physical All heavy equipment used on this project will be <br /> contact) in goad working order and operated in accordance <br /> with recognized industry standards and Cal- t <br /> OSHA Title 8, Subchapter 4, Construction Safety <br /> Orders. In addition, an exclusion zone applies to i <br /> all personnel. The exclusion zone will be 20 feet I <br /> to the front and either side of the operating drill <br /> rig. Personnel will not be allowed under booms or <br /> augers at any time. <br /> ` I <br /> All equipment operators and ground crews <br /> working in close proximity of heavy equipment. <br /> will be supplied with ear protection. <br /> 1,2 Dust The dust hazard will be mitigated by not allowing <br /> ground crew to'be located down wind of drilling <br /> and excavation activity. In addition, water will <br /> be applied to control the dust if visible leveis of <br /> dust are generated. <br /> Fire and Explosion' Hazards <br /> List Flammable or Combustible materials on-site. Keep sources of ignition away from these <br /> materials. <br /> „ larrlrtilalle, >rlash Pgint <100 bt=}...:. . Combustible (FIaSh Point: 200`aF} <br /> Gasoline <br /> Type and Location of Fire Extinguishers (Show on map for large projects) <br /> Dry chemical fire extinguishers, Class A, B, and C, are stored in all GZA vehicles. <br /> i <br /> PAGE 4 <br /> I <br />