My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
1
>
3500 - Local Oversight Program
>
PR0545764
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 9:51:58 AM
Creation date
6/9/2020 9:47:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545764
PE
3528
FACILITY_ID
FA0005330
FACILITY_NAME
ISC WINES OF CALIFORNIA INC
STREET_NUMBER
1
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95424
CURRENT_STATUS
02
SITE_LOCATION
1 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S <br /> GROUNDWATER TECHNOLOGY <br /> STANDARD OPERATING PROCEDURE <br /> CONCERNING MONITORING WELL INSTALLATION <br /> SOP 13 <br /> The boreholes for the monitoring wells shall be drilled <br /> using a truck mounted hollow stem auger drill rig. The <br /> outside diameter (O.D. ) of the auger should be a minimum <br /> of eight inches when installing 4-inch well screen. The <br /> hollow stem auger provides minimal interruption of <br /> drilling while permitting soil sampling at specific <br /> intervals. <br /> Soil samples can be taken at desired depths by hammering <br /> a conventional split barrel sampler containing precleaned <br /> 2 inch brass sample tubes. <br /> The construction details of the monitoring wells to be <br /> drilled at the site are graphically depicted in the <br /> attached figure titled "Typical Detail of Monitoring Well, <br /> Construction" (See Figure 1 ) . The wells should be cons- <br /> tructed of 4 inch PVC, . 020 inch machine slotted screen <br /> and blank casing. The screened portion of the well will <br /> extend 5 feet above and 10 feet below the present water <br /> table. An appropriate sand pack as determined by grain <br /> size analysis shall be placed in the annular space between <br /> the casing and drilled hole to inhibit silt buildup around <br /> the well. An annular seal installed above the sand pack <br /> should consist of bentonite pellets overlain by neat <br /> cement or cement grout to the surface. The wellhead shall <br /> be protected below grade within a traffic rated street box. <br /> Each well shall have a permanently attached identification <br /> plate containing the following information (1 ) Well Number, <br /> (2 ) Wellhead Elevation, (3 ) Depth of Well, ( 4 ) Screened <br /> Interval. <br /> Subsequent to installation the wells shall be developed <br /> to remove silts and improve well performance. The well <br /> development shall be conducted by air lifting the water <br /> within the well until groundwater pumped from the wells <br /> is silt free. <br /> To assure that cross contamination does not occur between <br /> the drilling and development of successive wells all <br /> equipment contacting subsurface soils or ground water <br /> shall be steam cleaned. The steam cleaned equipment <br /> should include but not limited to the following (1 ) <br /> Drilling Augers, (2) - Split Barrel Sampler, (3 ) Ground- <br /> water Monitoring and Sampling Equipment, (4) Well <br /> Development Piping 'and Sparging Equipment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.