My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
1
>
3500 - Local Oversight Program
>
PR0545764
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 9:51:58 AM
Creation date
6/9/2020 9:47:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545764
PE
3528
FACILITY_ID
FA0005330
FACILITY_NAME
ISC WINES OF CALIFORNIA INC
STREET_NUMBER
1
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95424
CURRENT_STATUS
02
SITE_LOCATION
1 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Re: Soil Remediation Work Plan <br /> _T W. Turner—Road,—Lodi ,—CA <br /> Fifth: Actual mixing process will take 10 days to 2 weeks. After <br /> a relative amount of time, perhaps 7 days, a preliminary set of <br /> soil samples will be taken to monitor the remediation process. <br /> Non-detectable levels of hydrocarbon will be strived for; however, <br /> levels of less than 100 ppm with no benezene, toluene, ethylbenezene, <br /> and xylene will be acceptable according to page 29 "Leaching Potential <br /> Analyses" in the LUFT manual . In the final analyses, 10 samples, <br /> using a minimum of 8 composits per sample, will be used in determining <br /> the levels remaining in the pile. Composits will be taken from the <br /> pile systematically on a grid spaged evenly over the piles. The exact <br /> grid can be laid out after the new piles are built. <br /> Sixth: After remediation and acceptance by the lead agency, all soil <br /> will remain on site and be used in the developement planned for this <br /> location. <br /> Extimated total amount of time to complete the entire remediation <br /> work is 60 to 120 days from start up. <br /> T & T Earth Services, Jackson, CA (209) 267-0903 will be the <br /> analytical laboratory. Terra Enviornmental will supply the final <br /> report for county approval . Technical information regarding microbe <br /> function will be supplied by Terra Environmental . <br /> Respectfully submitted, <br /> FORD CONSTRUCTION COMPANY, INC. <br /> JI�I RP OIL, NC. <br /> is and Thorpe, 0 ner Repreeentative <br /> Attachments: <br /> A. Health and Safety Plan <br /> B. Authorization to Release <br /> C. Copy of Foothill Engineering Classification of Contaminated Soils. <br /> from the' ISC Winery <br /> D. Copy of Jim Thorpe Oil site summary/history <br /> E. Drawing Figure. ] - Site location map <br /> F. Drawing Figure 2 - Plan of existing spoil and proposed work area <br /> G. Drawing Figure 3 - Plan of proposed treatment locations <br /> H. Copy of San Joaquin Air Pollution Control District letter <br /> I . Terra Environmental Technical Information MSDS information and USDA <br /> approved information <br />
The URL can be used to link to this page
Your browser does not support the video tag.