My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012640
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
1
>
3500 - Local Oversight Program
>
PR0545764
>
ARCHIVED REPORTS_XR0012640
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 10:13:42 AM
Creation date
6/9/2020 9:50:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012640
RECORD_ID
PR0545764
PE
3528
FACILITY_ID
FA0005330
FACILITY_NAME
ISC WINES OF CALIFORNIA INC
STREET_NUMBER
1
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95424
CURRENT_STATUS
02
SITE_LOCATION
1 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i -F'•. �4- 1 Ef <br /> �v <br /> P - <br /> SACRAMENTO <br /> Letter to Mr, Richard McCombs <br /> January 5, !988 <br /> Page 3 <br /> Assessment Pesults <br /> A visual inspection of the buildings, operations yard, wastewater <br /> Ponds, and adjacent properties was conducted on foot and by vehicle. Th:, <br /> facility driveway and parking lot are paved with four-inch thick <br /> asphalt. The remainder of the operations yard is lined with concrete. <br /> The entire site is enclosed within a six-foot high chain link fence <br /> which is topped with barbed wire. The facility buildings are <br /> constructed of wood, steel, and cincrete and many were demolished or <br /> were scheduled for demolition. The wine barrel storage warehouse and <br /> the distillation building were structurally weak and considered unsafe <br /> at the time of the site visit. These buildings are constructed with <br /> wood beam frames. <br /> The concrete wine fermentation building is constructed of precast <br /> concrete slabs. The fermentation building has 38 above-ground vats and <br /> 8 sumps, all of which are constructed of concrete. The vats and sumps <br /> were in good condition and no evidence of leakage was observed. <br /> The wood and steel chemical storage building was demolished on <br /> December 14, 1987. The buildingwas y <br /> trisodium phosphate, sodium caronate Previously and used <br /> the storage <br /> of <br /> compounds. ing <br /> •'There was no evidence of contamination resulting from any <br /> spills and, according to Nr. Beck, there have never been any spills. <br /> Insulation which contained asbestos was present on equipment in the <br /> distillation building. According to Nr. Beck, the asbestos-containing <br /> materials were removed during July, 1987, and disposed of by an asbestos <br /> removing contractor. The remaining portions of the bui}ding were <br /> demolished on December 14, 1987. <br /> e <br /> A 15,800-gallon underground fuel storage tank was located just north <br /> of the distillation building. The tank contained No. 2 diesel fuel as a <br /> backup fuel source for the natural gas-powered distillation boiler. The <br /> tank may also have contained bunker C oil. The exact age of the tank is <br /> unknown. The tank is constructed of concrete and was removed during <br /> January, 1987. At the time of Versar's assessment, the 14-foot deep <br /> tank excavation pit was approximately half filled with rainwater runoff <br /> (see Photo 1, Attachment 11). The excavati.on..__s.idewa?-ls--exhibit---- - - - <br /> -----s-ignif.i.cant---contamination —At-thd time of removal, soil sampled beneath -{-- -- — -- - - <br /> - ...--.-- ---_--- the tank idantified hydrocarbon contam:nation at levels --- ---------- <br /> - <br /> 2Z,000 parts per million greater than <br /> o H <br /> contaminated soil of the <br /> was to be excavated Asingtheavy equir. pnentland treated <br /> On Site beginning December 21, 1987. <br /> for the treatment of the soil have not beeneobtainedair <br /> fromemissions <br /> Sanprmits <br /> Joaquin County Air Pollution Control District. Although a plastic sheet <br /> has been placed under the excavated soil, the top of the pile was not <br />
The URL can be used to link to this page
Your browser does not support the video tag.