Laserfiche WebLink
Jim Thorpe oil, Inc. <br /> 351 N. Bockman Road 0 P.O. Box 357 a Lodi, CA 95241 <br /> (209) 368-6175 0 (209) 462.4551 <br /> Cnn3!actor's License /446699 <br /> �t <br /> Decc'r;r'Jer 9, 198r t, <br /> 4•, <br /> San JoaquinLocal Health District <br /> 1601 E. Hazelton Avenue <br /> p. 0. Box 2004 <br /> Stockton, CA 95201 <br /> Re: SOIL REMEDIATION WORK MN <br /> 1, A. Owner of property Ford Construction, Inc./Jim Thorpe Oil , Inc. <br /> P. 0. Box 357, Lodi , CA (2:79) 462-4551 <br /> 8. Address of Site 1 W. Turner Road, Lodi, CA <br /> C. Owner of tanks same as above <br /> D. Contact Person Richard Thorpe (209) 462-4581 <br /> 2. A. Scale Drawing Attached <br /> 3. A. History of Site k'inQry <br /> B. Tank Use Boiler Fuel Storage <br /> C. Products 1-5 Fuel Oil - later "2 Diesel Fuel <br /> 4. A. GroundwaterDepth 50 plus feet <br /> -" B. Soil Removed . .Approximately 1400 cubic ,Yards fluff <br /> C. Excavation History : The site was used as a winery from 1909 through 1984. <br /> On site was a distillery. In the distilling process a boiler was used. Fuel from <br /> the bailor was held in a 15,OOO gallon concrete vault tyke tank, which was desig�,ed <br /> to hold {6 bunker fuel. The best we can determine is sometime after World lea.• 1I <br /> the* fuel was changed to =2 diesel fuel. <br /> Jig Thorpe Oil, Inc. was hired by the previous owners (I5C Wines/The Beverage <br /> Source) to remove the vault, approximately 20' wide x 30' long x 10' deep, and <br /> diesel contamination was found. Buildings were demolished and clean up as attempted. <br /> Approximately 1250 cubic yards of non-contaminated soil was placed in a pile south of <br /> the excavated area. Work was stoDp ed after approximately 1400 cubic y::res �� cpntam- <br /> inated soil was removed and ~laced on Elastic north of the excavated area. The total <br /> excavated area as shiwn on =he "existing excavation,, plot plan is approximately 50' <br /> wide x 75' long x 20' deep. <br /> The previous owners had Groundwater TechnolocY, Inc. install eieht wF.115 C5 <br /> sample wells and 3 monitoring wells) around the perimeter n` the excavat;rn. See <br /> Ple results (pages r1al*ed 14, 15, <br /> attached copies of Groundwater Technology, inc. sara <br /> and 16} and "e xistina excavation"-plot plan--showin�i-well -locations. -Cere-s_ornp es - - - - <br /> shnwed no contamination to well locations at any level including aroun 6iater. <br />