Laserfiche WebLink
�. <br /> Wei <br /> RIO <br /> s <br /> intended ti,n. I f wa Ler i added t) thr• can tr�•,n.i.natsd sa.i 1 , i t <br /> shell be added b0fi-3r--' tris: asphalt ofnulEi.nii is, addr-d. ASr3halt: <br /> emu1%ion shall enter Ilio mixer Ott: the game no.int 7s the <br /> contaminated soil to provent oi.r emis�;ions. <br /> If the travel mixer mf.tllud is ii od, tfie mixer shall meet the <br /> requirements of Section 27 of the Standard Srjur-ifiz ations, State <br /> of California, Dept. of Transportation (Cal tranc,) . The travel <br /> mixer asphalt delivery system i5hall be equippu d with an asph'3lt <br /> mater, meeting the requirements of Section 39 of the Standard <br /> Specifications, State of C,a.lifornia, Dept. of Transportation <br /> (Caltrans) . <br /> B. Tr �sP_9 - oji anticin,g h:er_Yc.1�= ,. kltrF. <br /> Transportation of the recycled miXture !:;hall be made in and <br /> dump trucks equipped with tight fitting gates. Overloading and <br /> spillage of the recycle paving mixture will not be allowed. The <br /> mixture will be delivered directly to the placement site, and <br /> unleaded for placement. <br /> Placement will be made with equ1.pment meeting the <br /> requirements of Section 9 Standard Specifications, State of <br /> California (Caltrans) . After placement, the recycle mie,ture <br /> shall be compacted with a 8-10 ton steel drum roller. Compaction <br /> shall be completed within one hour of placement. Recycle pavement <br /> shall be placed to the lines and grades established by the <br /> Engineer. <br /> C. ualit-y CQ_rtro,_ ,.,.0f FAving Mixtures <br /> The mixing proportions shall be constantly monitored by the <br /> mixer operator to produce the required emulsion asphalt content <br /> of the mixture. Samples from the mixer, before transportation, <br /> will be taken for every 500 ton of mixture produced. These <br /> samples will be delivered to a certified testing laboratory in <br /> sealed air tight containers. Each sample shall be tested as per <br /> California Test Method 310, for asphalt and moisture content. <br /> Traffic shall not be allowed on the compacted recycle <br /> mixturs until the pavement is completely cured, and has attained <br /> full working strength. <br /> D. S �J14pY�-1t'�E1Y1?cJ �1_.:_ urEs, <br /> Recycle Pavement shall be sealed with a mixture of 50% water <br /> and 50% CRS--1 emulsion asphalt. The application rate will be <br /> 0,05 gallons per square yard of recycle pavement surface. The <br /> asphalt pavement shall b(:? fully cured before application, usL, 11y <br /> 2--3 weeks after placement. <br /> 2. <br />