Laserfiche WebLink
Schedule Name: PAVING FORD EQUIP. REPAIR SHOP FROM ISC WINERY MATERIAL <br /> Project Manager, DON FORD, FORD CONSTRUCTION CO. <br /> As of date: 11-Sep-90 4:04pm Schedule File: C.ITLDATAIISCWINE <br /> SET-UP ASPH. NIXING PLANT AT ISC WINERY, MIX CONTAMINATED SOIL VITH SS-IH <br /> HAUL TO NEN FORD EQUIP. REPAIR YARD ON CLUFF AV. <br /> 90 91 <br /> Oct Nov Dec Jan Feb <br /> Status 1 9 IS 22 29 5 13 19 2& 3 10 €7 24 31 7 14 21. 29 4 <br /> DESIGN EQUIP. REPAIR AREA = • , <br /> GRADE EQUIP. REPAIR AREA GRADE <br /> SANITARY SEWER CONST . SANITARY <br /> STORM SEVER CONST. STORM <br /> UNDER GROUND UTILITIES UNDER <br /> WINTER SHUT-DOWN WINTER <br /> SET-UP MIXING PLT.2 ISC WINERY , <br /> FINE GRADE PAVED AREAS . <br /> PAVE REPAIR AREA & ROADS , <br /> FINAL CLEAN-UP 0 ISC WINERY , <br /> MOVE-GUT MIXING PLANT , <br /> SITE APPOVAL$3 HEALTH DEPT. C ' <br /> --------------------------- <br /> O Done -_= Task - Slack time E==---1, or <br /> C Critical t++ Started task Resource delay <br /> R Resource conflict M Milestone ) Conflict <br /> p Partial dependency <br /> Scale, Each character equals 1 day --------------—------------- <br /> ------- <br /> Strip 1 <br /> TIME LINE Gantt Chart Report <br />