My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007372 CASE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
3500 - Local Oversight Program
>
PR0545765
>
ARCHIVED REPORTS_XR0007372 CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 10:17:27 AM
Creation date
6/9/2020 10:05:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007372 CASE 2
RECORD_ID
PR0545765
PE
3528
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 4-1 <br /> GROUNDWATER SURFACE ELEVATIONS <br /> October 1, 2001 <br /> Monitonng Date Depth of Elevation of Top of Depth to Groundwater <br /> Well Well (feet) Casinei Groundwatert'1 Elevation"' <br /> (feet) (feet) (feet) <br /> MW-1 12/18/00 3833 3700 2931 769 <br /> 3/28/01 3833 3700 3031 669 <br /> 6/28/01 3833 3700 2766 934 <br /> 10/1101 38.33 37.00 29.87 7.13 <br /> MW-2 12/18/00 3803 3701 2940 761 <br /> 3128101 3803 3701 3039 662 <br /> 6/28/01 3803 3701 2764 937 <br /> 1011101 38.03 37.01 29.92 7.09 <br /> MW-3 12/18/00 3843 3773 3019 754 <br /> 3/28/01 3843 3773 3118 655 <br /> 6/28/01 3843 3773 2855 918 <br /> 1011/01 38.43 37.73 30.75 6.98 <br /> Below top of casing <br /> (b) Elevation relative to Datum 37 feet at MW 1 <br /> 4.2.2 Groundwater Sampling <br /> The groundwater morutoring wells were purged prior to sampling The volume of water contained in each well <br /> was calculated usmg the depth to water and the]mown depth of the bottom of the well Water and sediment m the <br /> well was removed by repeatedly lowering a bailer into the water column to withdraw water until at least three <br /> well-casing volumes had been removed <br /> The color, clarity, turbidity, pH, temperature, and specific conductance of the water removed from these wells <br /> were recorded dunng the purging Table 4-2 lists the stabilized parameters Discharge water was contained in <br /> sealed,properly labeled 55-gallon drums until laboratory analytical results were received to guide disposal <br /> Following the purging and water-level recovery of the wells, water samples were collected with a disposable <br /> polyethylene bailer The bailer was lowered into the center of the water column using a new nylon rope Upon <br /> 1 retrieval of the bailer, sample containers were filled using the bailer's disposable polyethylene bottom-emptying <br /> device <br /> AT&T-Lodi,Quarterly Groundwater Momtormg Report No 3 <br /> NOATC ATC Project No 75 75128 0001 <br /> November 14,2001 <br /> Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.