My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007392 CASE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2000
>
3500 - Local Oversight Program
>
PR0545768
>
ARCHIVED REPORTS_XR0007392 CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 10:16:38 PM
Creation date
6/9/2020 10:24:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007392 CASE 1
RECORD_ID
PR0545768
PE
3528
FACILITY_ID
FA0003881
FACILITY_NAME
GENERAL MILLS
STREET_NUMBER
2000
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95242
APN
02903013
CURRENT_STATUS
02
SITE_LOCATION
2000 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> kTj Kt.EINFELDER <br /> A-3 4 Well Survey <br /> The locations of soil borings and monitoring wells, and the elevation of the top of the PVC <br /> 1 casings are usually surveyed and tied into permanent markers, if readily available Survey <br /> accuracy is 0 1 foot for the "x" and "y" coordinates and 01 foot for the "z" coordinate The depth <br />' to static groundwater is measured from a set location at the top of the PVC casing (usually the <br /> north rim) The depth of water is then subtracted from the elevation of the top of the well casing <br />' to provide a groundwater elevation for each monitoring well location <br /> A-4 GROUNDWATER MONITORING <br />' A-4.1 Water Level Measurements <br />' Water level measurements are made in the wells prior to purging and sampling the wells <br /> Measurement protocol is as follows <br /> 1 Prior to obtaining water level measurements, the monitoring wells would be opened and <br /> allowed to equilibrate for a period of approximately 1/2 hour <br /> 2 The water level probe is decontaminated in a trisodium phosphate or non-phosphate <br /> detergent wash, followed by a distilled water rinse, prior to use in each well <br /> 3 Water level measurements are made using a conductivity-based water-level meter <br /> Depth-to-water is generally measured from a surveyed mark on the north rim of the PVC <br />' well casing <br /> The water level measurements are converted to elevations using the surveyed casing elevations <br />' A-4 2 Groundwater Sampling <br />' Groundwater samples are collected from the monitoring wells at the site The sampling protocol <br /> for each well is as follows <br /> 1 Down-well equipment (pumps, bailers, etc ) is decontaminated by steam cleaning, or by <br /> scrubbing in a tnsodium-phosphate or non-phosphate detergent wash followed by a <br /> distilled water rinse, prior to use in each well Bailer cord is replaced prior to use in each <br />' well <br /> 2 The depth to groundwater is measured using a conductivity-based water-level meter <br />' 3 The volume of water in gallons standing in the well is calculated by subtracting the depth <br />' to groundwater measurement from the depth of the well and multiplying by the <br /> appropriate conversion factor (0 16 for 2-inch wells, and 0 65 for 4-inch wells) <br /> 28209 T03/ST03R181 1 Page A-5 <br />' ©2003 Kleinfelder, Inc December 29,2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.