Laserfiche WebLink
' k'q KLEINFEL DER <br /> To reduce the potential for introducing contaminants into the samples, the drive tip, galvanized <br /> pipe, and other equipment used for sample collection are steam cleaned and/or washed with <br />' trisodium phosphate or non-phosphate detergent solution and double rinsed with distilled water <br /> prior to use The sample probe and filters are cleaned in TSP solution and rinsed with methyl <br /> alcohol followed by a distilled water rinse prior to use New, factory-sterilized syringe needles, <br />' 0-rings, septums and sample tubes are used for each sample <br /> B-2.6 Sample Handling <br />' After labeling, the sample is immediate) stored in an iced cooler for transport to Kleinfelder's <br /> g P Y p <br /> office sample control or to the analytical laboratory A Kleinfelder chain-of-custody form <br />' accompanies the cooler The chain-of-custody form includes Klelnfelder's name, address and <br /> telephone number, the employee number of the individual who performed the sampling, the <br />' sample numbers, the date and time the samples were collected, the number of containers each <br /> sample occupies, the sample matnx (soil or water) and the analyses for which the samples are <br /> being submitted, if any The chain-of-custody form is signed by each person who handles the <br />' samples, including all Kleinfelder employees and the receiving employee of office sample <br /> control or the analytical laboratory when the samples are delivered <br /> B-2.7 Decontamination of Equipment <br /> To reduce the potential for cross-contamination, augers and associated equipment are steam <br /> cleaned prior to drilling each boring In addition, sampling equipment is cleaned with a <br /> trisodium phosphate or non-phosphate detergent wash and rinsed with distilled water prior to <br /> collecting each soil sample <br />' -B-2.8 Soil Boring Closure and Cutting Disposal <br />' Soil borings are closed immediately after the collection and logging of soil samples Closure is <br /> accomplished by grouting the boring with a cement/bentomte slurry or as otherwise required <br />' Drill cuttings will be placed in 55-gallon drums wrapped in plastic or spread around the boring <br /> and left on site for disposal by the site owner If requested, Klemfelder can coordinate disposal <br />' of soil and water after analytical results are available <br />' B-3 GROUNDWATER WELL INSTALLATION <br /> B-3.1 Monitoring Well Construction <br /> Construction details for shallow groundwater monitoring wells are as follows <br /> The well casing are 2- or 4-inch inside diameter, flush threaded joint, schedule 40 PVC pipe <br /> 20-1417-16 804/ST02R038 Page B-3 <br /> 02002 Klonfelder,Inc June 7,2002 <br />