Laserfiche WebLink
04 March 2002 <br /> AGE-NC Project No 99-0657 <br />' Page 4 of 4 <br /> 5.0. RECOMMENDATIONS <br /> IBased on the findings of this investigation,AGE recommends continued quarterly monitoring of the <br /> ground water monitoring wells The next monitoring event should be performed in April 2002 <br /> A work plan proposing the installation of additional ground water monitoring wells and the <br /> advancement of deep soil borings to determine the lateral and vertical extent of impacted soil and <br /> ground water has recently been approved by San Joaquin County EHD AGE anticipates the work <br /> will be performed during the first and second quarters of 2002 <br /> 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluation ofthe hydrogeologrc conditions <br /> at the site for the purpose of this Investigation was made from a Iimited number of available data <br /> points(ground water samples)and subsurface conditions may vary away from these data points No <br /> • <br /> other warranty, expressed or implied, is made as to the professional recommendations contained in <br /> this report <br /> I <br /> I <br /> I <br /> • <br /> Advanced GeoEnvironmental,Inc <br />