Laserfiche WebLink
i <br /> 27 August 2001 <br /> iAGE-NC Project No 99-0657 <br /> . Page 4 of 4 <br /> i5.0. RECOMMENDATIONS <br /> i Based on the findings of this investigation,AGE recommends continued quarterly monitoring of the <br /> ground water monitoring wells The next monitoring event should be performed in October 2001 <br /> i A work plan has recently been submitted to San Joaquin County PHS-EI1D proposing the <br /> installation of additional ground water monitoring wells and the advancement of deep soil borings <br /> to determine the lateral and vertical extent of Impacted soil and ground water AGE anticipates the <br /> iwork will be performed during the fourth quarter 2001 <br /> i6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> i environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluation ofthe hydrogeologic conditions <br /> at the site for the purpose of this investigation was made from a limited number of available data <br />' points(ground water samples) and subsurface conditions may vary away from these data points No <br /> other warranty, expressed or implied, is made as to the professional recommendations contained in <br /> this report <br /> I <br /> I <br /> IAdvanced GeoEnvironmentai,Inc <br />