Laserfiche WebLink
30 October 2000 <br /> • AGE-NC Project No 99-0657 <br /> Page 4 of 4 <br /> 5.0. RECOMMENDATIONS <br /> IBased on the findings of this investigation, AGE recommends <br /> • Continued quarterly monitoring of the ground water monitoring wells The next monitoring <br /> event should be performed in January 2000 <br /> • Additional monitoring wells should be installed in all directions to further assess the extent <br /> of the dissolved phase hydrocarbons <br /> r6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and slall ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluation of the hydrogeologic conditions <br /> at the site for the purpose of this investigation was made from a limited number of available data <br /> points (ground water and soil samples) and subsurface conditions may vary away from these data <br /> points No other warranty, expressed or implied, is made as to the professional recommendations <br /> icontained in this report <br /> I <br /> Advanced GeoEnvironmental,Inc <br />