My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007532
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2420
>
3500 - Local Oversight Program
>
PR0545769
>
ARCHIVED REPORTS_XR0007532
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 10:28:36 PM
Creation date
6/9/2020 11:39:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007532
RECORD_ID
PR0545769
PE
3528
FACILITY_ID
FA0004139
FACILITY_NAME
Plaza liquor and Gas
STREET_NUMBER
2420
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
2420 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:%i .,.!. �_< i'td7'%k.. r tf_ i , i ` . . ..r_ _ i -i '✓r� y�;n�.r'i + f!:hfcn 7 w,L <br /> Quarterly Report - First Quarter 2000 <br /> PLAZA LIQUORS II <br /> 2420 West Turner Road, Lodi, California <br /> I1.0. INTRODUCTION <br />' At the request of Mr Robert McCarty,Advanced GeoEnvironmental, Inc (AGE) has prepared this <br /> quarterly report for the property located at 2420 West Turner Road, Lodi, California The site and <br /> the surrounding area are illustrated in Figure 1 Structures, monitonng well locations are illustrated <br />' on Figure 2 <br /> The quarterly report is prepared in accordance with Central Valley Regional Water Quality Control <br />' Board (CVRWQCB) guidelines for the investigation of underground storage tank (UST) sites <br /> Background information is summanzed in the Preliminary Site Assessment Work Plan dated 19 <br /> November 1999 and prepared by AGE <br /> I <br />' 2.0 PROCEDURES <br /> Four ground water monitoring wells were installed in March 2000, and were purged and sampled <br />' on 05 Apnl 2000 Field work was performed in accordance with PHS-EHD and RWQCB guidelines <br /> and in accordance with PHS-EHD-approved Site Assessment Work Plan Addendum dated 30 <br /> December 1999 <br /> 1 <br /> 21 DRILLING AND SAMPLING <br />' In March 2000, four soil bonngs were advanced at the site The soil bonngs were advanced using <br /> a CME-75HT dell ng, equipped with 8 25-inch diameter hollow-stem augers to advance bonngs <br />' MWl through MW4 The drill ng and two-man crew were supplied by Mitchell Drilling <br /> Environmental Auger returns generated by drilling were stored on-site on visqueen plastic, pending <br /> laboratory analysis <br />' Soil samples were collected ahead of the drill bit using a California modified split-spoon sampler <br /> loaded with three pre-cleaned 2-inch by 6-inch brass sleeves The samples were collected from <br />' monitoring well pilot bonngs MW 1 through MW4 at five-foot intervals, beginning at 5 feet bsg <br /> using a 140-pound hammer to advance the sampler The number of blows required to advance the <br />' sampler over each 6-inch increment of the 18-inch sampling interval was recorded on the boring <br /> logs Sampling equipment was washed in an Alconox solution and rinsed with water prior to each <br /> sampling run to avoid cross-contamination <br /> 10 For each sample, both ends of the leading or other selected sleeve were covered with Teflon sheets, <br /> capped and sealed with tape The samples were labeled, stored on ice and transported under chain-of- <br /> 1 <br /> Advanced GeoEnviren mental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.